Work order
Have the work order at the press before starting the set-up
Mold number
What is the correct mold number and cavity ID. (Date clock). Green tagged and double signed.
Water
What is the correct cooling or heating process for the water on the mold or auxiliary unit.
Criteria
What is the correct criteria for the job per the IWI & part drawing.
Lockout tagout.
What is a machine or equipment that is locked out for use or service. (Documented).
Moisture test
How do you know the material is ready to start the press. or the work order is signed off by material and the label is correct.
Work cell
What is the correct cell layout matching the IWI.
Fixtures
. What are the needed conveyors, drill press and fixtures or jigs needed per the PWI.
Visual
What is recognizing an acceptable part per the IWI & part drawing.
Area
Machine and personnel areas or clear and safe.
PWI
Be sure the machine matches the PWI
Acceptable
What is an approved first piece sample.
Cooling
What are cooling racks or auxiliary fixtures.
Process
What is the correct process for machine set-up and part handling per the PWI & IWI.
Visuals.
What is inspecting eye hooks, chains, safety latches, hoists and area. Remove any non-necessary personnel or obstacles.
Work order
All documentation is correct and signed off.
Trouble shooting
What is the process log
Nozzle
What is the correct nozzle tip per the PWI.
Adjustments
What is the process log.
Hands
What is keeping hands free of any pinch points or crush opportunities.
Cycle time
Machine is running to the correct
End of run.
What is line clearance.
Knock out Rods
What is the correct length / tied in rods for the mold application.
End of run.
What is line clearance, documentation control, saving last shots.
Safeguarding
What is using pedestrian cord covers, equipment & robot guards.