Utilities and Design
Proposals
Agreements
PPA vs. Lease
Sunshine on a Cloudy Day
100
The terms of NET METERING are determined by_______?
The Utility
100
What is the first thing you should verify on the proposal?
Name and adress as it appears on the utility bill
100
What is Force Majeure?
Condition or circumstance beyond Solar City's control. For example: Named Storm, riots, war, abnormal weather
100
Section 3 is intentionally left blank in the agreement for a lease or a PPA? AND WHY????
PPA. There is no need to list the equipment.
100
Explain how a customer is billed on a MyPower agreement pre AND post the rate reduction payment
higher rate pre RRP and lower rate Post RRP that increases 2.9% annually
200
In EDlite after I remove the streets & markers and grab my map in google 0. What is the first thing I look for and how do I do it?
Obstructions. By looking at multiple views
200
In solar bid, where can you find the $ amount a customer will recieve in tax credits and rebates when a system is purchased?
The purchase tab before generating the proposal OR On the purposal if you select to show the purchase option
200
What happens if a customer does nothing at the end of their 20 yr term for a LEASE or PPA?
The agreement will automatically renew for an addtional 1 year term at a rate of 10% less than the then-current avarage rate charged by the local utility
200
Which has both a production guarantee and performance guarantee?
Lease
200
What floor is the CAMG building on?
Second Floor
300
What 3 things do we need from an Arizona Time of Use: Time Advantage Customer?
UB 12 kwh totals for last 12 months of total usage 12 kwh totals for last 12 months of peak usage
300
What can I click on to help me size a system with maximum savings for a customer?
Additional Sizes
300
In a PPA section 5 is first broken up in 2 parts. What are those 2 parts?
What you (the customer) agrees to and What we (SC) agree to
300
Name 2 Differences between a PPA & a Lease
PPA option to Purchase billing style Production gar on LEASE TRUE-UP on LEASE
300
What's the name of the Panel company we purchased?
Silevo Sucka!
400
What are AHJ reqs and why are they important?
The requirements for fire set backs in the city or other rules for installing solar
400
What do I click on if I want to add a down payment to the custom plan on a PPA or LEASE?
"Customize Payments"
400
Explain Indemnity to a customer in layman terms
If you mess with the system and it causes damages to the system or OTHER PROPERTY, we as Solar City will not be responsible.
400
How often will a customer true up with SolarCity? Is this for a PPA or lease?
Every 2 years. Lease
400
Name the VP of Inside Sales for LV and the 2 Directors:
VP: Emily Bowden D: Gary Allgood & Wil Fortenberry
500
Name the 3 Billing Styles and any sub categories of them:
Tiered Flat - regulated - de-regulated Time of Use
500
Where can I check to ensure my proposal is giving the lowest price from SolarCity possible?
Pricing or Pricing & Details
500
What is the name of the SolarCity feature that requires a home internet connection?
Powerguide
500
Name & Explain the 3 Sub-Options of a PPA & a Lease
PYG (2.9% Escalator) Custom (Solarbid starts at 0 down and 0% escalator) Full Pre-Pay
500
What sport did Lyndon play for the US team professionally?
Underwater Hockey