Name this
Technical Systems
customer Conundrums
Open the book/design
Poppuri
100

Photo #1

Sunny bundle or sun bundlers

100

When commissioning a SMA system what should you do when you are asked to create a password.


(We do all these the same so O/M doesn't struggle)

Password: Greenspark3!

100

What do you do when you have to poo

Everybody poops. Don't blow up a customers bathroom right next to their kitchen. use your judgement or take the vans somewhere. 

100

We are installing a new service on a ranch house. We are installing a 150a service. What is the minimum size GEC should we use?

What is #6 copper or #4 al

100

What Greenspark core value do yo most relate to? and how?



no wrong answers (for the most part)

Believe in People

Keep it real

Find Joy

Be a Leader

Work together

200

Photo #2

Intersystem bonding block

200

When commissioning a system an installer must check voltage on every string. They must also check for voltage from every home run to ground. Why do you do this? What is a proper reading and what is a bad reading? What does a bad reading indicate? 

Checking for ground Faults. A fault means here is voltage present between home run and ground.

200

Why Cant you turn my system on now?

You have not received final interconnection yet. Your current meter does not track current in both directions. We could get in trouble from the Utility by doing this.

200

Service entrance cables shall be supported at intervals not exceeding ____ inches


Hint: section 230

30"

200

Anchorage points for a personal fall arrest system must be able to support _____ per employee attached.

What is 5000lbs?
300

Photo #3

tandem 1p 20 square D home line breaker

300

This was a question on the last jeopardy no one got it right:

Give me the color order for a catv connector.

specify tab direction


striped orange, orange, striped green, blue, striped blue, green, striped brown, brown. 


left to right Tab away

300

Your response when a customer asks "can we add a few more panels?"

You may tell him weather or not they would technically fit, but you must refer to a salesmen. The system was probably designed this way for a reason. There is more to consider than space. (Inverter Loading, Fire setbacks, shading, ETC.)

300

We are working in a 400a service. We are installing a 200a circuit coming off that main service. What size equipment Grounding Conductor should we use?

What is #6 Cu or #4 Al

300
The proper torque for: UFOs, Ground lugs (iron ridge), rail hardware

what is 80 in-lbs, 80 in-lbs, and 250 in-lbs

400

Photo #4

 Look in your codebook give me the real name

(We just call it flex)

But its actually Liquidtight Flexible  Metallic Conduit

LMFC

400

When commissioning a battery system, what are some crucial steps that the installer must do to ensure the system is working properly.

Simulate a power outage!!!

Other acceptable answers: make sure all communications and monitoring are working and accurate. 


400

Your response to when a customer says, "you can remove your mask, were not worried about that in this house"

" Ok thank you for the option, it is our company policy to keep masks on inside, so I am just following the rules" 

400

The difference between a NEMA 3R, and a NEMA 4 enclosure

Bonus: What does NEMA stand for?

3R - protection against rain, sleet, and damage from external ice formation. 

4 - protection against windblown dust and rain, splashing water, hose-directed water and damage from external ice formation. 


Bonus - National Electrical Manufacturer Association 

400

To be qualified to sit for the NABCEP exam you must first.

(This is not the only way)

-Have documented six installations with decision making role.

-OSHA 10

-58 approved training hours. (PV101/202 qualify you)

500

Photo #5

Eaton BR Quad 30a 2p

500

What size breaker would you install with a 7.0kw inverter?

How did you get there?


7000/240v=29.17A

29.17A*1.25=36.46A (continuous duty correction)

Then round up to nearest breaker size.


Bonus: What is continuous duty mean?

500

Not a customer conundrum but oh well...


How do you bend exactly a 12" offset in EMT using 45 deg bends?

1.4*12=16.8


Place two marks in pencil 16.8 inches apart on the EMT bend two 45 deg bends on those marks in opposite directions

500

(120% rule question)

You have a 7000w inverter feeding a sub panel with a breaker. The subpanel has a 100 rated bus. The sub panel in fed from a 200a main service with a 100a breaker. 


Is this ok? What issues do you see. propose a solution.

7kw inverter need a 40a OCPD.

40a breaker in 100a bus fed with 100 breaks 120% rule.

40a of back feed in the MSP is ok because 1.2*200=240.


Proposed solution(two answers accepted): tap the sub, or re feed the sub with a 80a breaker.

500

How does a GFCI work? (Explain it in terms of current flow)

What does it stand for?

What is it intended to do?

partial credit awarded.

Ground fault circuit interrupter.

Intended for the protection of personnel.

This device monitors the amount of current flowing through the L1 as well as the current through the grounded conductor (Neutral). if it senses a difference it will trip indicating current has gone somewhere it was not intended to go.