100

What can you use to ensure accuracy when laying out and measuring grade?

A level

100

What can a transit level do that a builder’s level cannot?

Tilt upward to measure angles from the vertical

100

Where should the target for a cold beam laser be placed on the pipe?

The center line of the pipe

100

What do you need to identify before you can verify the layout of a system?

All underground utilities

100

When setting up a builder’s level, the leveling screws should be _____.

turned in opposite directions

200

A string stretched taut along the planned piping route at the desired slope is called a(n)

grade line

200

Which of the following statements is true?

It is more difficult to route DWV piping around water supply piping than vice-versa.

200

The purpose of an invertible faceplate on a commercial water closet carrier is to _____.

ensure level placement while maintaining pitch in the drainage line

200

A water test requires the water level in the pipes to remain stationary for 15 minutes with the system subjected to a pressure of at least _____.

10 pounds of water

200

To properly secure a water cooler to a wall, use structural backing or _____.

a carrier

300

Why should bathtubs be fitted into place before the finished walls are up?

To account for their size

300

What should you do after locating the center line of the main stack?

Determine where the building drain will connect to the building sewer

300

What can plumbers use to locate fixture rough-ins and both aboveground and underground piping?

Submittal data

300

To calculate the load factor for a DWV system, you can use information contained in the _____.

applicable local code

300

What can you use to check the plumb of objects with a builder’s level _____.

The vertical crosshair

400

Often, the points from which all trades will measure within the structure are _____.

the north and east walls

400

The minimum standards for training programs in the United States are set by _____

From the local plumbing inspector

400

A negative aspect of lavatory carriers designed to be mounted directly on stud walls or masonry walls is _____.

poor structural strength

400

A pipe-sealing device that blocks fitting openings by expanding a rubber gasket is called a(n) _____.

mechanical test plug

400

when determining the location of the exit for the stack through the roof, project the laser beam through the center of the hole cut in the _____. 

soleplate

500

To determine the approximate location of the water closet, consult the _____.

architectural floor plan

500

When connecting fixture drains, after cutting the pipe to the correct length, assemble the branch line starting from the _____.

sanitary tee

500

What is the first step when plumbing a building?

Locate the fixtures

500

To protect a pipe that will pass through a concrete footing, install a(n) _____.

sleeve

500

At the point where the stack penetrates the roof, vent flashing is installed to _____.

prevent rainwater from entering the building