Regulations
Departure/Approach
Weather
IFR Flying
Checkride Ready
100

91.179

NEODD, SWEVEN, (no +500 feet), based off of magnetic course

100

Standard takeoff minimums

What is 200 FPNM, 35' above DER, and 400' AGL before any turns

100

This must be present for icing to form

What is visible moisture and structural temperature at or below freezing.

100

Instrument cockpit check

Airspeed - true at zero. Attitude - blue over brown, < 5 degrees bank. Altimeter +/- 75' of field elevation. T.C. - wings level ball in cage, then wing in direction of turn ball opposite. Heading - matches compass. VSI - note error, no more than +/-100 FPM


100

When is an instrument rating required?

< VFR Wx mins

File IFR

Class A airspace

SVFR between sunset/sunrise

To carry passengers for hire more than 50nm day or at night



200

91.171

Airborne - +/- 6

Ground reference - +/-4

VOT - +/- 4

Dual - +/-4

DEPS

200

Difference between ODP, SID, STAR

ODP - mainly for obstacle clearance, pilot requests/informs ATC

SID - alleviate ATC workload, improves efficiency, larger airports

STAR - same as SID but reverse phase of flight

200

This three-letter code in a METAR indicates the height of the lowest ceiling, and is the value used to determine if the ceiling meets standard instrument approach minimums.


What is BKN or OVC

200

Rule to determine if alternate is required

0 instrument approaches or 0 wx reporting

1 hr before/after ETA

2,000' ceiling

3sm

200

Gyroscopic instruments? Pitot-Static instruments? Vacuum driven? Electrically driven?

Gyroscopic (Attitude, Heading, T.C)

Pitot-Static (Airspeed, Altimeter, VSI)

Vacuum (Attitude, Heading)

Electric (T.C.)

300

91.185

VFR - continue VFR and land as soon as practicable

IFR - AVEF, MEA

300

FPM if GS is 80, and required climb gradient is 260 FPNM.

347 FPM

300

Describe the 3 ingredients for a thunderstorm and the 3 stages

Lifting mechanism, sufficient moisture, instability.

Cumulus - primarily updrafts

Mature - precipitation, both updrafts and downdrafts

Dissipating - primarily downdrafts

300

VOR errors

Line of Sight, Cone of Confusion, Slant Range, Reverse Sensing
300

Approach category speeds

A - <90

B - 91-120

C - 121-140

D - 141-165

E - >165

400

91.183 + AIM 5-3-3

Missed Approach, Airspeed +/- 10 kts or 5%, Reaching holding fix, VFR on top, ETA +/- 2min, Leaving a holding fix, Outer marker, Unforecasted Weather, Safety of flight, Vacating an altitude, F.A.F (inbound), Radio/Nav failure, Compulsory reporting points, 500 FPM climb/descent unable

400

FPNM if 10 knot headwind, Vy climb out, and 350 FPM.

305 FPNM

400

Examples of anti-icing and/or de-icing equipment and pros/cons to each of them

Boots, con - only covers leading edge, pro - operates off of bleed air

Weeping wing, con - can only carry so much fluid, pro - airflow will take fluid over all of wing

Bleed air, con - pilot may not start at right time, pro - never going to run out

400

Explain RAIM & WAAS?

RAIM monitors integrity of GPS satellites

WAAS gives a more precise position of our aircraft using wide are reference stations, master stations, and geo-stationary satellites.

400

How much RVR is 7/8 sm

4,500 feet

500

91.175 (c) & (e)

What is continuous position to land using normal maneuvers, flight visibility met, visual reference in sight (ALS*, threshold...). Operation below MDA, upon arrival at DA/DH and it's use is required, identifiable part of airport not distinctly visible during circling approach*. 

500

Weather takeoff minimums for Part 91, and 91.175(f)

Part 91 - zero ceiling, zero visibility

91.175(f) - two engines or less, 1sm. More than two engines, 1/2 sm


500

An instrument pilot crossing a mountain range on the downwind side in strong perpendicular winds may encounter severe turbulence and strong updrafts/downdrafts even in clear air, often marked by this distinctive cloud formation potential structural-threatening conditions below the wave crest.

Rotor cloud

500

MSL altitude block for a VH VOR that goes out only 70NM

5000' - 14500'

500

Explain in depth the pitot-static system and all of the errors that can happen with blockages

ASI - pitot tube and static port, diaphragm

ALT - static port, aneroid wafer

VSI - static port, calibrated lead, diaphragm