FDR VS Investigation
SDM Tools
Screening Assessment and Safety Assessment
Safety Plan and Vulnerability Assessment
100

These are the two phases to FDR 

What is assessment phase and the protection services phase

100

This is what SDM stands for

What is Structured Decision Making 
100

This is when a safety assessment is completed 

What is within 24 hours of first meeting
100
This is how often vulnerability is reassessed

What is every six months

200

This is maximum length that an FDR can be

What is 4 months (1 month plus 3 month extension)

200

These SDM tools are not used anymore

What is vulnerability assessment, vulnerability re-assessment, and vulnerability re-unification assessment 

200

This is when we would first ask about indigenous heritage 

What is screen assessment 

200

The vulnerability assessment reviews _________ not current safety

What is future harm

300

What is the response time to make contact with a family during a FDR vs investigation 

What is 5 days for FDR and 24 hours for investigation

300

These SDM tools are used during the assessment cycle

What are screening assessment and safety assessment 

300

The safety assessment reviews the ____________ safety of the child, not future harm. 

What is current

300

This is when you need to provide notice to an indigenous governing bodies

What is before taking significant measures

400
These are the policy numbers that cover FDR and investigation in chapter 3

What is 3.2 for FDR and 3.3 for investigation

400

This SDM assessment tool is optional during the practice cycle

What is the Family and Child Strengths and Needs assessment 

400

These are two protective capacities found in a Safety assessment 

What is look at the SDM tools pg 39 

400

This is who needs to sign a safety plan

Who is anyone involved with the safety plan (including family friends, relatives, etc.)
500

This is the criteria for considering a Youth Service Response instead of FDR or investigation

What are youth are aged 16, youth does reside with the parent, section 13 concerns are present

500

This is what Bethanie kept calling Darin Greene during training

Who is Scott

500

These are the 5 parts of the safety assessment

What is: Factors influencing child vulnerability, safety factors, protection capacity, safety interventions, safety decision

500

This is the purpose of a safety plan

What is to address the immediate safety concerns of a child