Autonomous Maintenance
Organization
Loss Elimination
IWS General
Progressive Maintenance
100
This person owns Finding and Fixing defects on their equipment as well as developing the CILs, CLs and Action Plans to prevent their reoccurrence.
Who is the Equipment Owner?
100
Provide Leaders with the capability to create and maintain a High Performance Organization delivering the Compelling Business Need.
What is the Org Pillar Purpose?
100

The leader of the IWS Leadership Pillar

Who is the factory lead?

100
They are the 2 PM Pillar RTT DMS's
What are Planning & Scheduling and Breakdown Elimination?
200

This is when the Equipment Owner focus is initial Cleaning / Find and Fix Defects. 

What is the Focus for AM Step 1?

200

11 principles that drives everyone to perform at their peak. 

What is the HPO principles?

200

The only DMS owned by the LE pillar 

What is CO DMS?

200

Planning and improvement thought process in IWS owned by leadership pillar

What is PDCA?

200
Provide the capability for optimum equipment and process conditions efficiently and cost effectively.
What is the purpose of PM Pillar?
300

This is when the Equipment Owner focus is 'Addressing Sources of Problems' using systematic tools including: CILs, Centerlines (CLs) and the SOC/HTR prioritization matrix.

What is AM Step 2?

300

A timely diagnosis and a systematic, user friendly tool to assessment and design.

What is OPM?

300

The Primary Tool of the Loss Elimination Pillar

What is a LE funnel?

300

A leadership DMS process

What is DDS?

300
Evaluate the equipment and set up the proper tools & facilities to drive capability in the site maintenance system
What is the purpose of PM step 1?
400
These are the 3 AM Pillar RTT DMS’s
What are Defect Handling, CIL and Centerline?
400

Tool measure health and progression of team effectiveness.

What is TEAT?

400

What, Where, Which, When, Who, To Whom, How and How Much


What are the 6W2H questions to define a "Refocused Problem Statement" of any situation?

400

The process to set direction and strategies

What is SDDS?

400
To restore deteriorated areas and correct design weaknesses
What is the purpose of PM step 2?
500

These are the key AM Results. (AM RTT DMS Output Measures)

What are Unplanned Stops and unplanned downtime?

500

A tool used to assess the workplace culture in reference to the required IWS culture needed.

What is PBAT?

500

Material, equipMent, Method and huMan.

What are the "4M's" of a "Cause & Effect - Fishbone Diagram"


500

10

What is the number of IWS pillars?

500
The two Ouput Measures of the PM pillar
What are Breakdowns and M&R Cost?