Local lab
Quoting
Operations
Wildcard
Sales
100

The things you do before a customer visits the lab

What is  -    book a conference room, let Rachel know, make sure engineering is available to meet with the customer

100

The documents that are needed to quote a hazloc project

what is     an RFQ & a contract review

100

how big is our EMC chamber?

what is -    3 meter semi anechoic chamber
100
how many kids does Mik have?

what is -    1

100

where do you go to do an expense report?

what is -   you go to the intranet, and click on "PeopleSoft Financials"

200

The name of the Intertek Plano shipping guy

Who is    -   Lamont

200

when is it ok to use "report revision" as a standard in a  quote?

what is    -   never

200

the difference between a field label and an LPC is

what is -    an field label is done at the end customer site.  The equipment must be installed & powered up for us to do our evaluation.


An LPC can be done a customer's site, or at Intertek.  It is a limited production certification, and is very similar to a listing

200

What is the new name of the shire?

what is -    Gillespie's Tavern

200

When setting up a call with an engineer, the correct way to do that is.

what is -   check their outlook calendar to see when they are free, then ask them on teams / in person if they are free at that time to join the call

300

The RPS's in Plano

who is   -     Sokkien Chen, Diamond Spikes, and Charlie Mead

300

A customer wants a quote.  What documents do you request from them?

what is  -     an RFQ, schematics, drawings, user manual, component data sheets, photos, any technical information that they might find helpful for engineering

300

what is the final step before a report is sent to the certification group?

what is -   technical review

300

What is the name of the person who wears suspenders in the EMC lab?

what is -   Ricky Hill

300

How many activities are required each month?

what is -    275

400

Our physical address

what is 

1809 10th Street

Suite 400

Plano, TX  75074

400

when writing a quote for a report revision, how do you find the standard?

what is   -   log into tru delivery and download the report.  You include every standard in your quote
400

A deposit invoice is?

an invoice sent before a project start, when a customer needs to pre pay for a project

400

When is the super bowl this year?

what is -  Sunday, February 12th

400

who do you go to to get an NDA reviewed?

what is -    legal- either Rozeta Johnson (or Courtney Lang)

500

The 2 types of EMC chambers in Plano  (what are you testing for)

what is    emissions & immunity

500
name the new shift rate for core safety

what is -    $2,275

500

Once a project gets open, what do you do with the technical documents?

what is -   you upload them in EPF
500

When was the first Thanksgiving?

what is -   1621
500

What docs are needed to set up a new customer in iConnect

what is -   a W-9 and a credit app