Org & Regulations
Project Development and Planning
Award
Post-Award
Also Post-Award
100

The forward deployed element of the FEC that provides a full range of NAVFAC facility and environmental products and services to installations

What is the PWD?

100

Category of Work (COW) that requires limited design & engineering efforts

What is III?

100

A contract turnover meeting should occur no later than XX days after receipt of award notification

What is 10 days?

100

Marks the formal start of the post-award design development process to discuss requirements and events that will occur during the design process for DB

What is the Post Award Kick-off (PAK)?
100

Primary stormwater pollutant at a construction site

What is sediment?

200

Labor regulation that requires all contractors on Federal contracts over $2k for construction, alterations, or repair to pay their laborers not less than prevailing wage rates and fringe benefits

What is the Construction Wage Rate Requirements Statute?

200

Obtaining information specific to the item to be acquired and determining whether or not it can be met by something available in the commercial market.

What is Market Research?

200

The Government enters into two separate contacts: one for design and one for construction

What is Design Bid Build (DBB)?

200

An IGE is required for any modification expected to exceed

What is the Simplified Acquisition Threshold (SAT)?

200

A contractor's production report is submitted for every XX days of no-work

What is 7 days?

300

NFAS implements and supplements the... (3 parts)

FAR, DFARS, and NMCARS

300

Number of parts in a RFP package.

What is 6?

300

Approval authority for a SSP before the final solicitation

Who is the Source Selection Authority (SSA)?

300

Examines project functions and requirements, analyzes alternate design concepts, exposes and resolves project issues, and develops the final conceptual design

What is the Concept Design Workshop (CDW)?

300

Provides authority to close-out a contract file

What is the contract completion statement?

400

OSHA General Industry Requirements can be found in

What is 29 CFR 1910

400

UFGS and UFC can be found on

What is the Whole Building Design Guide website?

400

Informs offerors of their strengths and weaknesses in their proposals

What are post-award debriefings

400

Weeks in a calendar year that the contractor's primary QCM may be substituted with their alternate

What is 2 weeks?

400

Neither acceptance of a facility by the Government, nor the end of the warranty period, will end the contractor's, manufacturer's, or supplier's liability for

What are latent defects?

500

Has the authority to administer contracts on behalf of the Government

Who is the Contracting Officer (KO)?

500

Prohibits authorizing and obligation that exceeds the amount available

What is the Anti-deficiency Act (ADA)?

500

NAVFAC contracts will identify five (5) critical areas that require acceptance testing (name the five)

What are electrical, fire and life safety, mechanical, roofing, and underwater structures?

500

Notice that must be given for a preparatory meeting

What is 2 days?

500

System is used to process invoices electronically for NAVFAC contracts

What is Wide Area Workflow (WAWF)?