Contracts and Estimates
Mathematics
Who or What Am I
Safety
Vocabulary
100

The builder agrees to complete the project as described in the plans and specifications for a fixed sum...

What is Lump Sum Contract ?

100

The square footage of a room 15.5 feet long by 23.75 feet wide...

What is 368.125

100

The individual that calculates the materials, labor, and equipment needed to complete a construction project...

What is a Estimator ?

100

When using this machine you MUST use a push stick to move the stock you are cutting through the blade in order to protect and secure the safety of your hands...

What is Table Saw ?

100

The calculation of the approximate amount of material and or labor requirements to build a construction project. They are prepared from finished working drawings and project specifications...

What is Estimating ?

200

The builder is paid for all the costs of the construction project " plus " an agreed fee...

What is Cost Plus Contract ?

200

Linear Conversions, Area Conversions, and other calculations...

What are Mathematical Equations ?

200

The person responsible for the day-to-day oversight of a construction site, management of vendors and trades, and all the communication of information to all the parties involved throughout the course of a building project...

What is General Contractor ?

200

You should NEVER use these muscles when lifting  heavy objects...

What is Back ?

200

This stud is a supportive construction element usually used above a door or beneath a window...

What is a Cripple ?

300

The builder does not bid the for the whole job; instead, he or she quotes a set of individual prices for each of the work involved...

What is Unit Price Contract ?

300

7,527 feet = _________ inches

What is 90,324 inches ?

300

Detailed measurement of materials and labor needed to complete a construction project and is an important part of producing an accurate construction project estimate...

What is a Quantity Take-Off ?

300

How often should ladder inspections take place ?

What is everyday prior to using the ladder ?

400

The builder first investigates the current market values of the types of homes he or she intends to construct. Then, the cost of a certain design of a home is estimated to determine if it can be built for the market price or value....

What is Value Based Pricing ?

400

The decimal conversion of 23/32...

What is .71875 ?

400

This type of hammer/ mallet is used when installing flooring in order to prevent damaging the flooring during installation...

What is Rubber Mallet

400

Wearing a hat, sunglasses, and sunscreen are precautions that should be taken to protect workers from...

What is Sunlight ?

400

The builder first investigates the current value and market prices of the types of homes he or she intends to construct. Then, the cost of a certain design of a home is estimated to determine if it can be built for the market price and value...

What is Value Based Pricing ?

500

Budgets are established from the project estimate to show the amounts available to build a project. As the work progresses, further estimates are needed each month to determine and control: How much work has been done, what is has cost so far to do that work and what it will cost to complete the project. 

What is Cost Based Pricing ?

500

Base ( ft ) x Height ( ft ) / Divided by 2 = ( sf ) is the mathematical equation for finding out the square footage of this shape...

What is a triangle ?

500

Budgets are established from the project estimate to show the amounts available to build the project. As the work progresses, further estimates are needed each month to determine and " control ": How much work has been done, what it has cost to do that work, what it will cost to complete the project...

What is Cost Control Estimates ?

500

To warn workers about an open stairwell in a construction site , a ______ color sign should be used...

What is Red ?