Microsoft Project
Planning and Scheduling
Misc
100

This activity type is a rollup of tasks. It can be expanded and collapsed.

What is a Summary Task

100

This is often better to use to represent a wait time instead of a lag

What is a Schedule Visibility Task (SVT)?

100

This is a the difference between a critical path and driving path

The critical path is the path that drives the very end of the project. A driving path is the path that drives any activity before the end of the project.

200

This activity type is a marker that represents a significant accomplishment and has no duration, work, or cost assigned to it.

What is a Milestone?

200

This is "The Law of Dependencies"

The predecessor MUST _____ before the successor CAN _______

200

This represents labor, material, or capital that may be utilized to accomplish project work.

What is a Resource?
300

These are the three dependency types we can use between Predecessors and Successors in Microsoft Project

What is Finish-to-Start (FS), Start-to-Start (SS), and Finish-to-Finish (FF)

300
These are the three most important date fields an activity can have

Forecast,

Actuals,

Baseline

300

These are considered "Soft Constraints"

Start-No-Earlier Than (SNET), Finish-No-Earlier-Than (FNET)