Replenishment
Inbound
Outbound
Expeditor
Toss-Up
100

This is what manual replenishments generate from

What is Inventory Control Actions?

100

This is how many replenishment audits must be completed each shift

What is 50? 25 pick mod/25 floor

100

Over picked cases are to putback as broken boxes are to 

What is damages?

100

The expected time ICAs should be resolved

What is 2 hours?

100

You find three boxes of broken/unsellable gloves in a primary bin, this is what you do with them

What is systemically place in the damage bin and physically take to damages?

200

This is the form used when drivers find inaccuracies in locations

What is the Problem Pallet form?

200

The color of the pallet quantity labels?

What is yellow?

200

This is how many days the Putback bin has before going out of standard.

What is 6 days?


200

HERE'S A FREEBIE FOR BEING GREAT!

GREAT JOB

200

Only people certified on all three equipments apart of IC: DPJ/OP/Reach

What is Kenyaata, Kenny, and Mario?

300

This is the current LPH (Lines Per Hour) expected from replenishment drivers 

9.0 LPH

300

This is how high and how many per row a pallet is

What is Ti-Hi?

300

This is how many days the damage bin has before going out of standard

What is 7 days?

300

If you selected this; name the associates completely trained in PRE expeditor

Shanell; Ashley; Halee

300

This is considered a freebie for your team

What is a great pick ;D

400

If you selected this; name all associates currently training/trained in replenishments for the point value

Aydin; Compassion; Elisha; Kenny; Ray; Kenyaata; Randy; Scott; Mario; 

400

This is where we find all of the items a vendor has sent to us

What is a Purchase Order PO?

400

If you selected this; name all associates currently training/trained in putbacks for the point value

Jessica/Sheila/Halee/Shanell/Kenyaata/Compassion

400

This is how many days the expeditor bin has before going out of standard 

Hint: don't overthink it ;D

What is none? 

Post expeditor does not have a bin

400

Teams Lead can approve adjustments from these two numbers

What is $350 - $1,000?

500

This is the current range of great utilization

What is ~85% to ~100%?

500

This is how many days the putaway bin has before going out of standard.

What is 3 days?

500

This is how many days the picked bin has before going out of standard.

What is 2 days?

500

A closed box with missing items is considered

Hint: think of the post expeditor missing part flowchart 

What is a Manufacturing Error(Missing Parts)?

500

Adjustments for over $1,000 are completing by these members of the team

What are the IC Management?