100

Never cut a tree without this

What is payment guarantee or advance deposits

100

Location of all landings , tractor roads, and skid trails shall be agreed upon prior to their construction. 

What is B6.422 Landings and Skid Trails?

100

Fire in the sale area determined to have been caused by purchasers operations

Operations Fire

100

This provision outlines Pruchasers requirements commensurate with their use

What is B5.31/C5.31#

100

Waterbar locations

HI and higher

200

This is where you would find stewardship project amounts

What is A4C


200

The CO's favorite provision

What is B6.3 Control of Operations?

200

Fire determined to have been caused by smoking in the sale area

what is Negligent Fire

200

Additions, deletions, or changes in types and diameters of culverts shown in the plans can be considered this

What is Design Change

200

Agreeing to remove timber not listed in A2

CO

300

This will likely be charged for timber willfully or negligently cut

What is B3.46 Liquidated Damages

300

Requires inspection of work within a certain timeframe and Purchasers assurance it has been completed

What is B6.36 Acceptance of Work?

300

Fire determined to have been caused by lightning inside the sale area

What is Other Fire

300

This provision is used to agree to and allow construction of temporary roads

What is B5.1 Authorization or C5.102#

300

agreeing to changes in C6.4#

FSR

400

Base Rates are typically used for this on a 2400-6 contract.

What is reforestation?

Reference essential KV.

400

This provision requires hammer branding of included timber in pieces 8' in length or more and at least 1/3 sound

What is B6.842 Product Identification

400

Fire determined to have been caused by a crew member smoking along the haul route but outside the sale area

Negligent Fire

400

This is where you would find which party to the contract is responsible for construction staking

What is A7

400

Agreeing to substitute fire precautions

FSR

500

Under this provision, the FS by agreement shall perform all or portions of the work that the Purchaser is obligated to perform

What is B4.218 Cooperative Deposits


500

This provision requires Purchasers to furnish Domestic Processing Agreements upon transfer of unprocessed included timber

What is C8.66# Use of Timber

500

Fire caused by lightning outside the Sale Area

What is, a fire not covered by B7.4 with no purchaser requirements 

500

If under Purchasers Operating Schedule, roads needed for the removal  of included timber differ substantially from Specified Roads, we may agree to one of these

What is B5.26 Alternate Facility 

500

Approving administrative closures for roads or trails

Line Officer (Forest Sup or Acting)