GL CODES
GENESIS SCREENS
KNOWLEDGE
IMS
AUX CODES
100

Site repairs needed before installation can be completed

What is 892400?

100

Delivery schedule for each store truck

What is 1.5.3?

100

Independent PROvider incorrectly paid for install

What is create expense recovery (ER)?

100

Customer name, ph#, address

What is customer summary?

100

05

What is meeting aux code?

200

Job is greater than 30 days old and second measure fee is needed.

What is 892800?

200

Vendor information

What is 6.9 or 1.11?

200

Necessary to address issue post installation

What is create work order?

200

Stock item sold, Lowe's delivery sold, product staged

What is history?

200

93

What is non-productive or personal?

300

Poor craftsmanship-active by original PROvider who is still an active installer for Lowes

What is 892000?

300

Checking inventory

What is 5.1?

300

Incorrect, damaged or defective caught before or during installation

What is Pre-Installation or Job site issues?

300

690729284

What is the job#/detail#?

300

01

What is break?

400

Should only be used upon request of stainmaster

What is 892403/Stainmaster Warranty?

400

Installation estimate history for SOS orders for the last 90 days

What is 1.12.1?

400

$75/$50

What is a trip fee?

400

Installer for 690729284

Who is CRST Home Solutions?

400

04

What is training?

500

Product received from vendor is damaged or defective

What is 892401?

500

SOS order information and status

What is 1.12.12?

500

For questions about what qualifies for filing a manufacturer warranty claim

What is Manufacturer Warranty Claim Quick Reference Guide?

500
Originating Labor PO for WO001340858 & status

What is 170843067 & closed?

500

02

What is meal/lunch?