Inflation/Budget
Mixed Bag
Simulations
Program Specifics
ACRN
100

This is the type of indices we typically use in our cost estimates

What is composite?

100

This is the Milestone conducted prior to the EMD Phase

What is MS B?

100

You are provided historical production data for an analogous system to understand the learning experienced. This is the first step you should take.

What is normalize your dollars?

100

These are the prime contractors for the Development of SEWIP Block 2, SEWIP Block 3, and SPEIR

What is Lockheed Martin, Northrop Grumman, and L3 Harris?

100

SEWIP

Surface Electronic Warfare Improvement Program

200

This is the appropriation used for system procurement for new construction hulls

What is Shipbuilding & Conversion, Navy (SCN)?

200

This is the budget we will mark up at DON-27

What is PB-26 (or Pre-DON27 per Mo)

200

You receive an email from your APM requesting the Unit Pricing for the systems being procured in FY24. These are what you need to consider and where you go to find this information.

Considerations: What is the procurement quantity in FY24?

Where you go: What is the fielding plan (smoothing file) and contract (step ladder pricing)?

200

This is the scope on the SEWIP Block 3 EMD contract (and it aligns with typical EMD contract scope)

What is 1) Preliminary Design, 2) EDM, 3) LRIPs 1 & 2, 4) Engineering Services

200

EDM

Engineering Development Model

300

This is the inflation process required to convert an actual non-recurring design cost from an FY15 budget to an input into a cost estimate for a MS review in FY26

Utilizing the RDT&E composite inflation index from the JIC, divide by the 2015 weighted index & multiply by the 2026 raw index

300

These are the typical appropriations of funding that are utilized during the O&S phase

What are PO OMN, Fleet OMN, MPN, OPN

300

The Safety team at NSWC Dahlgren reaches out and requests an additional $100K of funding. These are your next steps.

Depending on whether they have received their entire budget (i.e. under CR), confirm whether this is additional funding they have now or additional planned funding. Assuming additional funding, request details on the purpose of the funding and review Funding Tracker (Spend Plan) to determine whether there is funding in Reserve, consider reducing other activities, or FARFing funds. Discuss requirement with APM and receive concurrence on requirement and path forward.

300

This is when SEWIP Block 2 completed FRP DR

What is SEP 2016?

300

POM

Program Objective Memorandum

400

These are the 3 Defense Budgets in order with the months they typically occur in the year

What is DoN (June/July), OSD (August/September), PB (December/January)

400

This effort is commonly de-scoped from EMD contracts in order to meet cost and schedule objectives/thresholds

What are EDM quantities?

400

Your client asks you to begin preparing for the upcoming POM cycle. These are some initial steps you should take to prepare for an initial discussion with your APM.

Review POM issues from last FY and whether the requirements were funded or are still relevant

Assess your budget vs requirements and document any potential gaps in funding

400

This was the largest cost driver in the Production and Deployment phase at SEWIP Block 3 MS C (also typical cost driver in P&D)

What is Recurring Hardware?

400

OEM

Original Equipment Manufacturer

500

This is what PPBE stands for and an example of actions per phase

What is Planning (CONOPS development, AoAs), Programming (POM development), Budgeting (Budget development, Spend Plan development, Execution (Ledger reviews, Funds to Go)

500

This is the difference between phasing costs in Development, Production, and O&S

Development is based on schedule and historical trends, Production is driven by procurement quantities per year, O&S is driven by fielded quantities per year

500

You are performing risk and uncertainty analysis for a MS B LCCE and review your Coefficients of Variation (CV) for all your program phases. This is the phase you expect to have the largest CV and why.

What is O&S and because it is the furthest away, with the most unknowns

500

This event is an entrance criteria for FRP DR that has continued to slip to the right and has ultimately caused the SEWIP Block 3 FRP DR to shift to the right

What is IOT&E?

500

DMSMS

Diminishing Manufacturing Sources and Material Shortages