ESP Part 1
ESP Part 2
More ESP
100

It is the uniform means of identifying individual pieces of equipment at District facilities.

Equipment tag numbers


ESP 130.0

100

Which component of drawing number 1475-C-001 (Scenic East PP) is the Facility Number?

A. 1475

B. 001

C. None of the above

C. None of the above.

The Facility Number is not used as part of the drawing number. Per ESP 120.6, 1475 is the Structure Number. To find the Facility Number for Structure Number 1475, you can look it up using the Facility Guide.

200

These are the 2 types of District facilities that have substructure numbers

Water Treatment Plants and Water Supply Reservoirs

200

This person in Engineering Records that assigns structure numbers

Allen Gerten

ESP 120.4

200

In a Water facility, these are the components of an equipment tag

Facility Number - System Code - Equipment Code - ID Number - Modifier (Optional)

ESP 130.0

300

The person who assigns Facility Numbers

Mark Foley in Asset Management

ESP 130.0

300

Modifications and demolitions CAN be shown on the same revision of an existing structure-number-based (SNB) drawing. True or False?

True. For SNB drawings, if a revision cannot clearly show both demolition and modification, then a demolition drawing with the same drawing number but ending in "D" can be produced as revision 0.

ESP 120.6

300

This type of form is prepared by the Project Engineer or the Drafter for obsolete drawings upon completion of the related project.

Drawing Disposal Request

ESP 120.5

400

A switchgear is located at Maloney PP (Facility #314). It can provide power to Maloney PP, as well as Sobrante WTP (Facility #236). What is the facility number for the switchgear and why?

Facility #236, because Sobrante WTP is the major facility.

ESP 130.0


500
A switchgear feeds 3 different pumping plants, Pumping Plant A, B, and C. Per ESP 130.0, the switchgear was given Pumping Plant C's facility number. What does this indicate about Pumping Plant C in relation to the switchgear's assigned facility number?

Pumping Plant C has the largest pumping plant capacity out of the 3 pumping plants.

500

A G drawing showing the structural floor plan of a building is being renumbered for revision. The building houses two pumping plants, Pumping Plant A (Str. #101) and Pumping Plant B (Str. #102). What can be indicated about Pumping Plant A if the renumbered drawing number was given the structure number 101?

Pumping Plant A was built before Pumping Plant B. If both was built concurrently, the drawing is given the structure number of the pumping plant with the lower structure number.

ESP 120.4