What monitor is required to be worn by all contractors on ExxonMobil locations?
PAM H2S Monitor
How many LSRA's are there?
12
If I secure loose tools and work materials to prevent dropped objects, what LSRA am I following this safeguard for?
Working at Height?
What is an Unplanned Interrupter, that once observed prompts us to utilize and LMRA to evaluate & mitigate a hazard?
Trigger
I'm only backing up 10 feet, do I still need a spotter?
YES! Spotters shall also wear an ANSI Class 2 Hi-visibility vest or shirt.
Where can you find the Start Work Checks (SWC) outlined for all critical LSRA tasks?
Start Work Checks are listed under each LSRA.
I only operate equipment that I am authorized or trained to use?
What is Safe Mechanical Lifting or WAME?
What is a Planned Interrupter, meant to slow us down from fast to slow thinking before an LSRA/LAI task?
Hold Point
Traveling back toward Williston, what directions am I traveling?
WEST
What tool helps us determine our LSRA safeguards?
Following the Start Work Checks under each LSRA will help to identify safeguards that should be in place.
I have validated prompt rescue capability when wearing fall protection?
Working at Height?
#1 Question Every second, minute, hour, of every task on tour should be???
"What could kill or maim me during this particular activity?"