Demolitions
Bridging
RECCE SGT
Basic Soldier Skill
General Engineer Knowledge
100

How to calculate Time Fuse Length?

Walk time/ Burn Time

100

When Construction A Gyn, what Knot Do you use before and after the Lashing?

Clove Hitch

100

When is Time of RECCE wasted?

Never

100

Max Section effective Fire for the C7?

700m

100

What Is MLC Stand for?

Military Load Classification

Tons (US)

200

How many holes are needed to Crater a Gravel Road?

No Define answer without Calculation

RECCE

200

What is Heavier Bottom Panel or Junction Panel?

Bottom Panel

197KG

Junction Panel 

182KG

200

During a Reserve Demolition what is the Min Distance off the MSR should the Fire Point be placed?

30M

200

What does it mean when you Hear 3 "Bangs" on Metal?

Gas, Gas, Gas

200

What Can a Double Bowline be used for in an Emergency?

To Sling A Person in a Recovery

300

What is the Safety Distance for Concrete Obstacles?

1000m

300

What is the length of an ACROW Panel Pin

206mm

300

What is COA mean?

Course Of Action

300

Kill Range of a M67 Grenade?

5m

300

Emplaced Obstacles should be cover by what?

Cover by Observation and Fire

400

What is the Min Gap to achieve in Demolition

55m

400

What is the Length of an Interior Bay of MR?

6.9m

400

On the F1A1 Firing Device what Pin acts on a release of Pressure?

Round Pin

400

If Unsure of Rank how do you address them?

Mr , Mrs

400

Ethos?

To Live Move, Fight and deny the Enemy the Same.

500

What is the Max Depth that can be achieved with a Camouflet Set?

2.4m

500

What is the Load Classification on a 12 Bay Single Store MGB?

MLC 16

500

How Many Engineers does it take to Build MGB?

1

 Bridge Commander

500

Position, Target Acquisition, Sight alignment and Picture, Shot release and Follow though, are the following of what?

Marksmanship Principal

500

What does MGRS Stand For?

Military Grid Ref System