Amazon Acronyms
Safety First
ACES World
People Matter
Team Player
100

PxT

What is People Experience and Technology

100
What is the reporting criteria timeline to notify WSIB from the date of injury

What is 72 hrs

100

I ensure flow per hour is maintained by reducing inductor and line loader downtime

What is Water Spider B

100

The real place where value is created

What is Japanese Term for Gemba

100

What is the campaign for Q4 hosted by Amazon Gives/community Impact.

What is "Every Plate Matters"

200

ACES

What is Amazon Customer Excellence System

200

SCN Three Core Products

What is SBI, ASK and SLI 3.0

200

I evaluate how sort errors should be processed and water spider these defects to the next location?

What is a Problem Solve Assistant

200

___ Is a branded suite of engagement resources; ex. Table Toppers, Engagement Activity sheets. Its used to drive quality engagemnt at site level among AA/DA/Leaders

What is ATE (All things Engagement)

200

Target for Waste Diversion Rate

What is 75%

300

FOT

What is Field Ops Transfer

300

How many questions does a compass audit have?

What is 70 questions

300

Within how many minutes are AAs expected working in direct process path to complete their first scan from clocking in

What is 7 minutes.

300

Based on Escalation Matrix V-19 at what rolled Volume do you need to escalate to Regional volume not crash sorted (Rolled to next day)

What is Rolled Volume >1,000 that will not be crash sorted, dispatched and delivered

300

Award to recognize top-performing Delivery Associate

What is FrontRunner

400

BAU

What is Business as Usual

400

When is World Day for Health and Safety

What is April 28th
400

Sixteen Defects that collectively provide insight into UTR Cost and Quality

What is First Pass Yield (FPY)

400

What tool supports individuals in engaging and aligning during conversations where language support is needed

What is SayHi
400

Acronym PLANTTS

What is Parking, Lighting, Assets, Noise, Trash, Traffic and Speeding

500

S&OP

What is Sales and Operations Planning

500

How many certified Members do we need to have for the JHSC

What is 2 worker members and 2 manager members

500

Process that organizes shipments based on only on a address, weight and a hard cap of 70%

What is Sort Plan/DCAP?

500

What standard work entails TWD

DA roundtable, DSP roundtable, Ride Along, DPR - DSP 1.0


Voice of Drive VOD, DSP SUM - DSP 2.0

500

How many Pillars in EPI

What is 8 pillars (Tasks, Permits, Training, Governance, Incidents, Audits, Waste, Inspection Checklist)