At what point during construction should a JHA be completed?

Before work starts

100

True or false:

A JHA must be reviewed and signed by all workers, project supervision, and HSE staff.

True

100

These team member are often overlooked when JHAs are created for the jobsite

Workers

100

What famous structure is held together in some parts with a mortar made of sticky rice and lime? 


Great Wall of China


200

True or False:

A JHA is required for every scope of work

False- it is required only for high-risk activity; (A Hazards, Life saving absolutes, new or inexperienced crew, new or specialized process)

200

True or false: Second tier subs need to complete JHAs for their scope of work

False- a second tier sub can work under the JHA of the main subcontractor, as long as the JHA includes their high risk work and their workers review and sign off on it

200


In recent years, PCL corporate HSE has stressed the need for JHAs to be completed which include and/or focus on what frequently overlooked area of safety?

Ergonomics

200



Name 1 of the top five states that report the highest wages for construction workers

Hawaii

Illinois

Massachusetts

Washington

Alaska

300

When should a JHA be audited?

Every 90 days that a task is still active (as determined by the District HSE committee), or when the scope, or hazards differ from the original JHA), and post-incident

300

Who is responsible for development, coaching, and implementation of JHA?

Project supervision and HSE staff

300

What should happen when a substandard act or condition leads to a class A hazard during implementation?

Project supervision should communicate this to the HSE manager, who will review and recommend corrective actions

300


This structure, the Pantheon, features the world's largest unreinforced concrete dome. What European city is it in?



Rome

400

What sections of our PCL JHA are frequently omitted from a trade contractor's JSA, AHA, or JHA?

Pre-and Post-control ratings (A,B,C)

"Controls verified" field

Worker signatures

400

Name one instance where a JHA might require the review of an engineer and the district HSE manager

Manbaskets suspended by a crane

Engineered lifts

Any activity where required by legislative jurisdictional requirements and/or PCL policies

400

Do JHAs need to be printed and stored in a binder?

No- they only need to be available to workers for review, and to project staff for auditing. 

It may be more practical in some cases to have a physical copy for accessibility reasons, but Bob Tarr auditors will not require it as long as the JHAs can be easily accessed for their review.

400

Name the "Fatal 4" hazard categories that lead to construction fatalities:

Falls

Struck-by

Caught In or Between

Electrocution

500


Name 4 key elements of an acceptable JHA

Includes all the job steps

Identifies all of the hazards

Reflects that the controls have been verified

Reflects specific job site 

Includes pre-and post control ratings

Includes signatures of all current workers, project supervision, and HSE staff


500

When a District HSE committee meets at a project, what should be done in the field?

JHA audit

500



What is the HSE Standard which guides PCL's  policies regarding JHAs? 

Standard 5 

(subsection) 6.2.2

500


Which FSO team member received a degree in construction management from the University below?