System designed to control the fall of a worker and minimize the injury once the worker has fallen.
What is Personal Fall Arrest System
(Full body harness, lanyard, tie off anchorage, etc.)
100
Tops of buildings, high lines, vessels or crane operation should be avoided during these types of storms.
What is a severe lightning storm.
100
Minimum acceptable size of electrical cord is 12 gage, 3 wire, heavy duty.
What is an extension cord.
100
Daily, written, detailed pre-task planning is required for all activities. All high hazard activities should be pre-task planned with the supervisor actively leading the planning process.
What is a Pre-Task Plan.
100
Are to be worn with the bill facing forward and the suspension worn in manner approved by the manufacturer.
What is a hard hat.
200
System that should consist of a top rail, intermediate/mid-rail, toeboard and posts.
What is a Guardrail System
200
Seek shelter below grade (staying inside structures is recommended but exterior doors and windows are to be avoided) when this "funnel like" storm.
What is a tornado/hurricane.
200
Use the proper cutter for the job and ensure that the cutter’s capacity rating is not exceeded.
What is bolt or wire cutters.
200
DPR’s intent is to eliminate incidents, accidents and business interruptions by utilizing and standardizing best known methods. Through the recognition and communication of existing and potential hazards, coordination of work crews and taking the appropriate measures, DPR aims to ensure all tasks are performed incident free.
What is Pre-Planning.
200
Should be worn any time the nature of the work has the potential to cause a hand and/or finger injury.
What is hand protection.
300
May be needed when there is a potential for operator injury due to physical contact with facility systems or structures and in congested areas.
What is a "Spotter"
300
Area where workers are to meet after evacuating the building.
What is the emergency assembly area.
300
Where wet /damp conditions exist, tools and equipment should be protected with.
What is GFCI.
300
Should this occur during the course of work, the pre-task planning worksheet is expected to be utilized during the investigation and root cause analysis process.
What is an incident/accident.
300
Should be worn when kneeling or crawling for extended periods of time.
What is knee pads.
400
Only ladders permited onsite.
What is Type 1, 1A and 1AA fiberglass ladders.
400
Discontinue any current work procedures that require the use of electricity to operate equipment used as an engineering control for safe work practices.
What is loss of power.
400
Use and inspection of wheel and equipment should follow manufacturer’s guidelines.
What is a grinder.
400
Pre-Task Plan is completed by this person(s).
What is Superintendent, Foreman, Supervisor.
400
Should be worn for protection from bloodborne pathogens, infectious materials, etc.
What is Latex or surgical gloves.
500
Required to be completed prior to using a scissor lift?
What is a daily inspection form.
500
Are expected to participate in and follow all emergency response procedures and must respond immediately to instructions from supervision, DPR incident command and from emergency response agency personnel.
What is ALL workers.
500
Ensure bits and sockets are inspected and replaced routinely.
What is Drills, Screwguns and Impact Guns.
500
Conduct periodic audits to ensure that the pre-task planning is conducted properly.
What is Project Management.
500
Hard hats, safety vest, and safety glasses.
What is required to be worn at all times when on site.