This feature will automatically attempt to charge the battery 48 hours in advance of a grid event.
What is weather guard?
This is the primary chemical compound used in Sonnen batteries to store energy
Lithium Iron Phosphate
An Enphase system utilizes this type of inverter to provide AC power from each panel.
This is the shortened company mission statement
What is 100% Customer Satisfaction?
When an technical issue is discovered at commissioning due to something being wired incorrectly which we are unable to fix, we send the ticket to this department and assign it to these people.
What is the Installation department and who are the lead installer or panel tech (assign), Stephanie (assign more) and Terry (assign more)
Shading or panel production mismatch are issues that are mitigated by this device.
What is a Power Optimizer?
This is what a Sonnen battery will do in order to prevent solar from over-producing while operating in backup.
What is Phase Shifting?
This onsite device allows users to monitor their solar system's performance.
What is an Enphase Envoy?
The original purpose for the commissioning team.
What is Capturing Referrals the Energy Technicians miss?
This is the maximum number of reviews, and where they can be placed, that can be done at a Solar+Battery commissioning where two homeowners are present.
What is 10? 1 per customer on the following sites: Google (Layton), Google (SLC), Facebook, Better Business Bureau, and Solar Reviews
This feature dynamically adjusts the PV power production in order to ensure that power sent to the grid does not exceed a pre-configured limit.
What is Export Control?
Sonnen Core 10kWh systems utilize Battery Management System cables that must be placed in this particular order as labelled on the modules and head unit.
What is X2 to X2, X1 to X2, X1 to X1.
This is the amount of continuous discharge a Tesla Powerwall 3 can offer.
What is 11.5kw charge/discharge?
This is the chain of command for the commissioning team and who they are.
What are Team Leads (Undecided), Managers (Mike and Ben), Director (Brandon)
Additionally: Chief Operating Office (Jeff), CEO (Chris)
This is the entry field(s) of Quickbase where changes to the commissioning time, date, and assignment.
What is "Commissioning Date" and "Assigned Commissioner"?
SolarEdge systems utilize these four communication protocols to transmit data from the inverter to the monitoring system.
What are Cellular, Ethernet, RS485, Wi-Fi
This is the approximate weight of a 20kWh Sonnen Core unit.
What is 525 lbs?
Enphase Micro-Inverters and Tesla Batteries are known to have these warranty durations.
What is 25 years for Enphase Microinverters and 10 years for Tesla batteries?
This current ES Solar office was the first one the company had.
What is Suite C?
These 2 things are needed to report a system fix you did.
What is a 'Commissioning Fix It Work Order' and an update to the existing ticket?
This color pattern specifies this condition by an Orange blinking light on the EV Charger.
When a battery exceeds this amount of amperage it is considered an overloading issue.
What is 20 Amps per unit?
This is the phase the production CT must be connected to on an Tesla system.
What is phase 2?
This is the state in which the ES Solar LLC is located.
What is Delaware?
This is the section where you can check the status (sold, cancelled, etc.) of a referral you set an appointment with.
What is the 'Leads' section in Quickbase?