Kiewit History
Safety First
Your Responsibilities
Kiewit Markets
Estimating & Scheduling
100
This is the year Kiewit was founded.
What is 1884?
100
This is the Kiewit safety policy.
What is Nobody Gets Hurt?
100
If you are at a project, every morning begins with this
What is a Safety/Play of the Day Meeting?
100
The number of main markets Kiewit is involved in.
What is 6? -Building -Mining -OGC -Power -Water/Waste Water -Transportation
100
These are scheduling specifications.
What are production and delivery dates?
200
This is the type of business Kiewit originally started as.
What is Masonry/brick building?
200
This is a system of components including posts, top rail, mid-rail and toe board.
What is guardrail (system)?
200
This is one of the schedules Field Engineers are responsible for.
a.What is an equipment schedule? b.What are addressing safety problems? c.What are preparing work plans?
200
Over the past 70 years, this district has moved more than 4.6 billion cubic yards of material.
What is Mining?
200
This is a system that Kiewit recently purchased and is used for estimating.
What is Hard Dollar?
300
This is the year the first non-Kiewit family member ran the company.
When was 1969?
300
It consists of a harness, lanyard and anchor point and is abbreviated “PFA”.
What is a personal fall arrest system?
300
This person is responsible for task planning, facilitating self-inspections for craft/trades, and assist in the interpretation of construction codes and standards, among other tasks.
What is a Quality Coordinator/Engineer?
300
This market makes up 36% of Kiewit’s 2016 revenue.
What is Transportation?
300
This is a tool used for scheduling.
What is P6?
400
Kiewit has about this many districts company wide (a given range)
What is 35-45?
400
When an excavation reaches this depth, stairs, ladders or ramps must be provided.
What is 4 feet?
400
Based in an office or a construction job site, this person is responsible for troubleshooting job conditions, payroll, managing subcontracts, and accounting.
Who is the Business Specialist?
400
Although a smaller market, this particular one is across the whole continent. Kiewit’s West Closure project in New Orleans, LA moves 19,140 cubic feet of water per second.
What is the Water/Waste Water market?
400
This is the first step in building a schedule.
What is knowing/finding the scope of work?
500
Kiewit’s current chairman and CEO
Who is Bruce Grewcock?
500
This device protects personnel from electric shock and is required by OSHA for all cord and plug connected electrical power tools used in construction activity.
What is a GFCI (Ground Fault Circuit Interrupter)?
500
These people create guidelines and coordinate activities for project teams.
Who are the Design Engineers?
500
This market strives to build LEED accredited structures, with more than $1 billion in LEED construction experience.
What is the Building Market?
500
This result is what you get when dividing EARN vs. ACTUAL (man hours).
What is the Productivity Factor?