Complete
The PVR must be reviewed prior to the ____ with the business in order to maintain the QCA defined when the project was awarded
SOP
Complete
During CPP ...
a review of QCD results (view to completion) against the ___________ set.
objectives
Complete statement
The project manager is in charge of monitoring product costs (PRP), components, raw material… and presenting them to the ____
CPP
Purpose of this Op´Instruction
a) Describe the necessary steps for a request for quotation and supplier selection during the development of a new external component, equipment or service, in a project phase or a major modification
b) Any external components, equipment or services included in the Bill of Material of the final product, or having an impact on finished product. Including in case of modification (ECR)
a) Describe the necessary steps for a request for quotation and supplier selection during the development of a new external component, equipment or service, in a project phase or a major modification
Complete
In the specific case of non-acceptance from the supplier on PPM level to achieve, an impact analysis must be performed by the PM. If no consensus
found between the PM, the Buyer and the ____, the issue must be escalated in the action plan of project purchasing reporting.
a) PLM
b) PGM
C) PLD
b) PGM
Complete the below
For “green” material, data are extract from SAP to get the components with green material and to know the weight of each component concerned. It is compared with the ______ _________ of the part
a) all data
b) total weight
c) main components
total weight
The PDM extractions defined in the score card for CPP ( CLI02-01-004 -appendix 2) at least during
a) RP3 ,RP5 and RP6
b) RP3, RP4´and RP5
c) All RP´s
a) RP3 ,RP5 and RP6
From RP4 the PRPs are taken from ____. The price connection must be ensured before SOP.
a) ODL
b) SAP
c) PVS
b) SAP
Mention at least 2 Inputs of this process
Full BOM + purchasing targets planning + tech. specifications + Drawing (frozen or functional)
SCT is applicable for all external supplies and / or Industrial equipment, services for any new project except in the following cases... mention 2 of them
Carry over
Annual peak turnover <3000€
For standard and specific equipment, services, outside of the project BOM (a multi-criteria scoring grid available in the tool box dedicated to indirect purchases is used as a decision-making tool)
Complete with correct answer
All changes managed by the _______ ______ must be reviewed during the CPP
product line
The role of the project steering committee is to confirm the quotation of the risks and to make decisions regarding ________ ________ on the basis of the proposals
a) Project risk
b) actions taken
c) blocking points
c) blocking points
By RP4... PRP is equal to ____
PRP=PRC
What is the output of this process...BUSINESS AWARD MANAGEMENT
Open Order Creation
SCT is also mandatory in case of... mention at least 1 case
Suppliers with NBOH, To phase out with deviation from EVPP (he must be included in SCT signature loop).
Change of supplier with a carry over component, whatever the turnover
Complete the sentence
Only the changes managed with a _______ _____ must be recorded in the CPP file
quality plan
All part references must be identified in the project's EDM (PDM and Portal) and in SAP at least at _____
a) RP3
b) RP4
c) RP4´
a) RP3
CPP monthly managed by
PLM or Engineering manager with support of ....
a) Project Managers and PQE´s
b) Steering comittee
c) Technical manager and QSEE manager
c) Technical manager and QSEE manager
In the case of an imposed supplier and / or component by the customer, information must be given by the PM to the Buyer with evidence of this imposition like...
(Directed buy letter or Multi Party Agreement (MPA)
In the case of carry over with an AKWEL or final customer tooling ownership, the buyer must ensure by written, both:
1. The condition of the tooling (remaining shots to produce) and
2. The capacity of the supplier to comply with the additional volume awarded.
Complete the statement
Changes managed by the _________ _______ are followed up monthly during a specific meeting (see CLI02-01-003) and not during CPP.
technical group
Realization of project reviews: The Project Manager must carry out project reviews according to the deadline. Indicate the last planned project review
according to the schedule presented and the last review actually carried out. If the review on the schedule appears red, it indicates that it is late. The PM must indicate the
a) risk
b) re-planned effective date
c) reason why is late
b) re-planned effective date
SOP date: The SOP date is coming from ______ ____________________If the date of the SOP is passed, the PSW must be accepted with customer waiver if necessary.
SAP (Finished product view )
Any comments on the CDC from the supplier must be approved by the ___ ___ ____ ____by signing the “final agreement” cell of the CDC to consider
the supplier’s offer (see CLI02-01-006). It is up to the Buyer to make sure of that.
PM and the PQE
Do we need a SCT If new tools are needed?
True
False
True...unless annual turnover in peak
is below 3000 euros.