100

The special characteristics need to be controlled along the...

a) Design, Industrialization and Delivery.

b) Design, Process and Product.

c) Design, Tooling and Parameters.

a) Design, Industrialization and Delivery.

100

It’s a description of the dimensional measurements,
material, and performance tests that occur after prototype and before
full production. 

a) Pre-launch control plan

b) Prototype control plan

c) Production control plan

a) Pre-launch control plan

100

When the EPS detects a defect at 100 % and segregates the product from going further to the next step action on detection) it is named 

____ __________ ________ _______

100% Automatic integrated control

100

What CLI´s are involved in the Control of SC? (3)

CLI01

CLI02

CLI03

100

Likewise, special characteristics must be transferred to our _________ through specifications, functional plans

suppliers

200

It is the German standard Quality Assurance in the process landscape...

VDA 4

200

Documentation of product/process characteristics, process controls, tests, and measurement systems that occur during mass production. It applies from the receiving (materials, components,..) to the delivery to the customer. It lists all the important
process parameters as well as important or special product characteristics.

Production Control plan

200

EPS  is


Error Proofing System

200

Measurement and Improvement of SC are part of

a)CLI02

b)CLI01

c)CLI03

c)CLI03

200

What CLI02 instruction references the Special characteristics capability must be proven during the Product / Process validation

a) CLI02 01 019

b) CLI02 01 017

c) CLI02 01 032

a) CLI02 01 019

300

What is the CLI02 Operating Instruction for Process flow Chart and Control Plan

CLI02-01-017

300

Complete the sentence:

The ______ ____ is a reference document which commits AKWEL to its customer.

Control Plan

300

Complete...

The control of SC starts as early as the ______phases, together with the feasibility estimation and analysis required by the Customer. 

a) Costing

b) Development

c) Design

a) Costing

300

The SC´s lists needs to specify:

a) SC, origin, value, control method

b) Plan, functional analysis

c) Validation plan

a) SC, origin, value, control method

300

Who is responsible for verification of «product » SC
conformity

Laboratory/Metrology

400

Classification of a product characteristic or manufacturing process parameter that can
affect safety or compliance with regulations, fit, function, performance,
requirements, or subsequent processing of product ...

Special characteristics

400

Part that is representative of a status validated by an
authorized body (customer or internal : Laboratory, Quality, Project). 

a) Challenge part

b) First parts

c) Master sample


c) Master sample

400

All non conforming SC can have _______ _______ (reputation at stake, financial impact,... ). Project Teams must ensure these characteristics are treated with utmost rigor and attention to detail 

a) Good impact

b) Significant repercussions 

c) Significant congratulations

b) Significant repercussions

400

Mention 3 documents where the SC´s needs to be reported

Functional analysis 

FMEA 

Validation plan 

Process flow chart 

Control plan 

Manufacturing / Control Instructions

400

Activities in the Deployment phase for SC´s:

a) analysis, goals, actions, new standards

b) regulations,  feasibility, customer requirements


c) validation plan, drawings, product validation, components PPAP


c) validation plan, drawings, product validation, components PPAP

500

A description of the dimensional measurements, material, and performance tests that will occur during
building of the prototype ..is

a) Pre-launch control plan 

b) Prototype control plan

c) Control plan

b) Prototype control plan

500

Define POKA YOKE:

When the EPS avoids the production of non conforming parts (action
on occurrence)

500

Any modification to SC will be considered a ______ modification according to the Operating Instructions CLI02 01 003. 


major

500

It is not an AKWEL symbol for SC´s

a) Diamond

b) Triangle

c) Nut/hexagon 

a) Diamond

500

Activities in the Priorization phase for SC´s:

a) analysis, goals, actions, new standards

b) regulations,  feasibility, customer requirements


c) design and process FMEA

c) design and process FMEA