THE FIRST FIREFIGHTING ORDER
WHAT IS KEEP INFOMED ON FIRE WEATHER CONDITIONS AND FORECASTS.
WHAT MATERIAL IS OUR PPE MADE FROM
WHAT IS NOMEX
THE MINIMUM PPE FOR CHAINSAW OPERATIONS
WHAT IS LONG SLEEVE, EYE PRO, EAR PRO, HELMET, CHAPS, GLOVES, LEATHER BOOTS, MED KIT(TQ)
THE TACTIC USED TO ADDRESS A ROOT IN THE MIDDLE OF YOUR LINE CONSTRUTION THAT NEEDS TO BE REMOVED
WHAT IS CALL FOR A PULASKI BACK
THE CHAIN OF COMMAND
CREW SUPT, FOREMAN, SQUAD BOSSES, CREW MEMBERS
THE FIRST WATCH OUT SITUATION
WHAT IS FIRE NOT SCOUTED AND SIZED UP
THE FORM USED FOR IWI
WHAT IS AN 8 LINE
SIZES OF CHAINSAWS WE CARRY
WHAT IS 261, 362, 462, 661
SAFE PLACE TO BEGIN LINE CONSTRUCTION
WHAT IS AN ANCHOR POINT
THE TOOL ORDER FOR A HANDCREW
THE 5TH FIREFIGHTING ORDER
WHAT IS POST LOOKOUTS WHEN THERE IS POSSIBLE DANGER
THE MINIMAL BREIFING REQUIRED TO ENGAGE A FIRE
WHAT IS LCES
WHAT MATERIAL IS INSIDE CHAPS
WHAT IS KEVLAR
THE TWO TYPES OF HAND LINE CONSTRUCTION
WHAT IS DIRECT AND INDIRECT
THE ITEMS NEEDED ON YOUR PERSON AT ALL TIMES
IRPG, RED CARD, NOTE PAD, PEN, LIGHTER
THE 13TH WATCH OUT
WHAT IS ON A HILLSIDE WHERE ROLLING MATERIAL CAN IGNITE FUEL BELOW
REQUIREMENTS FOR DOWNHILL LINE CONSTRUCTION
WHAT IS A TFLD OR IC4, RAPID ACCESS TO ESCAPE ROUTE AND SAFETY ZONE, SUPT IS IN DIRECT COMMS WITH LOOKOUT WHO CAN SEE THE FIRE
THE FIRST CUT YOU MAKE WHEN FELLING A TREE
WHAT IS THE GUNNING CUT
THE CONSTRUCTION OF A PROGRESSIVE HOSE LAY
WHAT IS 200' OF TRUNK, GATED Y OR T, 100' OF LAT WITH NOZZEL
THE MINIMUM ITEMS NEEDED FOR A CREW TRANSPORT
LIST ALL 10 FIREFIGHTING ORDERS
WHAT IS 1-10
THE SIZE OF A SAFETY ZONE FOR 200' FLAMES
WHAT IS 800' OF SEPERATION AND 46 ACRES
THE METHOD OF MIDIGATING A "HUNG UP" TREE
WHAT IS FENCE POSTING
THE STRATEGY USED IN CULTURALLY/ENVIRONMENTLY SENSITIVE AREAS
WHAT IS MIST
THE QUALIFICATIONS FOR A TYPE 2 IA CREW
CREW BOSS, 3 TYPE 5 ICS, 60% OF AT LEAST 1 SEASON, 3 QUALIFIED SAWYERS