LAPM 3-A
Oh, No!
WOW
Testing
100

Caltrans district number for Napa.

4

100

Also known as "dirty" twelve

procedural errors

100

This agency is our new role model.

Ventura County

100

This program will assure materials and workmanship

Quality Assurance

200

It is important that this information stays consistent throughout all project authorization phases. 

Description of work

200

Always include this programmed sheet in all project authorization requests

FSTIP

200

The management tool used for SOPs is also known as the top of the mountain

PEAK

200

METS is abbreviation for an American professional baseball team but also for a Caltrans service.

Materials Engineering and Testing Services

300

FHWA identifies this as a key element which is used in determining federal funding eligibility.

Functional classification

300

During this phase your authorization request was rejected because the agency did not obtain specific authorization to relocate utilities or does not obtain approval of utility agreement.

Right of Way

300

The name of the bridge project shown has the same name as the actor who started in "A Star is Born" 

Bradley

300

They are responsible for assuring that projects receive adequate supervision and inspection 

STA - State Transportation Agency

400

This date is equal to advertisement date plus 12 months or City Council acceptance of construction contract plus 12 months.

Project end date (PED)

400

Your R/W Authorization was rejected because there was a violation of this act

Uniform Relocation Assistance and Real Properties Act

400

as part of the SOP this notice gets sent to property owners before construction

notice of out-of-repair sidewalk

400

This document defines roles and responsibilities between a local agency and caltrans

Co-op Agreement