OSHA
LOAD CHART
A/D
SITE
WIRE ROPES
100

Who must agree on voice signals before operations begin?

The operator, signal person, and lift director on the project

100

Jib capacity is based on:

Structural Competency 

100

When is it ok to remove pins that under tension

NEVER

100

What can be done to level a crawler crane

Use Mats under the tracks

100

For not rotation rope, how many broken wires in one strand of one lay before needing to replace?

2

200

Who is responsible for ensuring that ground conditions meet safety requirements before crane assembly or use?

The controlling entity

200
Define jib angle to ground

Main boom angle minus Jib offset

200

What is Span Blocking

Leaving gaps in the cribbing 

200

All hazards and ground conditions should be discussed..

At the Pre-life inspection meeting 

200

Design factor for the rigging when lifting personnel

5

300

Under 1926.1405, when must pins in pendants be removed?

Only if the pins are not under tension
300

To determine Gross Load 

Get accurate load weight

300

Who is responsible for ensuring adequate ground conditions before starting any A/D work

Employer or Controlling Entity 

300

Ground conditions must be..

Firm, Drained and Graded

300

Broken wires for Standing ropes, not allowed

2

400

What type of training must workers receive regarding power line safety?

Hands-on training on the dangers of electrical contact

400

When the layers on a winch increase..

the allowable line pull decreases

400

Who is responsible for following Manufacturers procedures when disassembling a crane

A/D director

400

When conducting a lift with a long boom lattice at maximum angle with soft ground, how would you position the crane for the lift?

Picking over the side 

400

IWRC design factor when hoisting personnel

7

500

Who has the responsibility of ensuring that power line voltage information is obtained?

The Employer

500

When is the gross capacity not to be considered 

When the line pull is less than the chart capacity

500

A pin-connected lattice boom is being dismantled. After connecting the equalizer (bridle) to the connecting lugs on the boom, which boom connecting pins should be removed first?

Lower connection pins, located at and ahead of the equalizer

500

When traveling with a short boom lattice, ascending up a grade. What position should the boom be facing?

Up hill at a safe boom angle 

500

18x19 rope, how many broken wires before needing to be replaced

4 per 30 diameters