This team provides technical support to customers and we often ask them for transformer frame drawings and wiring diagrams. 

What is the TRC -- Technical Resource Center?

100

This is required to properly install a breaker into a panelboard. 

What is a provision/connector kit? 

100

This automatically creates a new email with the email address that corresponds with the GO number as the sender. 

What is a macro? 

100
Sales is required to provide this when a budget order exceeds $1,500. 

What is a GOR form? 

200

This team provides instructions on returning items to Eaton and receiving credit for incorrect items. 

What is CORE -- Center of Returns Excellence?

200

These are the three types of main devices for panelboards. 

What is main breaker, MLO, and fusible switch? 

200

This is the time you would want to check out released items on BidMan. 

What is never? 

300

The role of the people who quote switchboard changes and validate switchboard configurations for main plants. 

What is an RSAE -- Regional Sales Application Engineer? 

300

This is the type of branch breaker used in PRL1 or PRL2 panelboards. 

What are miniature circuit breakers? 

400

This role in the sales office is the first escalation point for customer issues. 

What is an ASM -- Area Sales Manager? 

400

This type of breaker is mainly used in PRL4 panelboards and switchboards. 

What are molded case circuit breakers? 
500

This Eaton division includes low and medium voltage switchgear, MCC's, IPA's and unit substations.

What is PDCA -- Power Distribution Control Assemblies?

500

This type of switchboard requires a neutral ground bond, a special label, and a barrier between line side bus and load side bus. 

What is a service entrance switchboard?