LSS Fundamentals
DMAIC Process
Data and Measurement
Process Mapping
Root Cause Analysis
100

This methodology aids the achievement of corporate strategies and objectives by combining Lean and Six Sigma principles.

What is Lean Six Sigma?

100

This acronym stands for Define, Measure, Analyze, Improve, Control.

What is DMAIC?

100

This plan provides a clear, documented strategy for collecting reliable data and ensures data answers the right questions.

What is a Data Collection Plan?

100

This high-level process map includes customers, outputs, process steps, inputs, and suppliers.

What is theSIPOC?

100

This diagram creates a structured list of possible causes of a problem.

What is a Cause-and-Effect Diagram?

200

This acronym stands for Specific, Measurable, Achievable, Realistic, Time-bounded.

What is SMART?

200

In this phase, potential root causes are identified.

What is the Analyze phase?

200

Understanding whether data is continuous or discrete is important because different tools can only be used on the right type of data.

What is data space?

200

This creates a shared view of the process, provides a structure for root cause analysis, and identifies what is actually going on.

What is a process map?

200

Root causes are validated in this phase of the DMAIC process.

What is the Analyze phase?

300

This term represents a defect level of 3.4 DPMO.

What is Six Sigma?

300

Solutions are developed in this phase of the DMAIC process.

What is the Improve phase?

300

This phase involves establishing a process performance baseline.

What is the Measure phase?


300

The as-is process map visualizes these:

What are Rework loops, Bottlenecks, Duplicate or unnecessary activities?

300

To achieve permanent results in removing a defect, focus on these.

What are the root cause(s) or inputs?


400

This term describes customers’ needs and is used to ensure process outputs align with what is important to them.

What is Voice of the Customer (VOC)?


400

This phase includes implementing a process control system and project closure.

What is the Control phase?

400

The most important step in developing a data collection plan is to begin with these.

What are the questions you wish to answer?

400

This set of measures ensures process outputs are what are important to the customer.

What is Critical to Quality (CTQ)?

400

These are barriers to root cause analysis:

What are Team resistance to change, Leap to a solution, Preconceived notions for causes?

500

These are examples of Voice of the Customer information:

What are Interviews, Complaints, Positive letters from customers?


500

This phase is the best decision point to determine if a project is worth continuing or should be stopped.

What is the Measure phase?

500

This tool shows a summary across categories for measures of data center, spread, and shape.

What is a Box Plot?


500

This Pareto chart defect categories Emulsion (65), Other (30), Sewing (20), Grease (15) from left to right.

What is Emulsion, Sewing, Grease, and Other?

500

When a manager suspects poor performance at a service center, the best approach is to gather raw data to validate and understand the difference in performance.

What is agree to look into it and gather raw data?