Show:
Questions
Responses
Print
Define
Measue
Analyze
Improve
Control
100
contains a brief description of what is the “pain” being experienced by the company.
What is the Problem Statement
100
Compares the output of an in-control process to specification limits using capability indices
What is Process Capability
100
The mother of all wastes
What is Over Production
100
The rate at which the process needs to produce a single unit.
What is TAKT time.
100
Comprised of at least one run for every treatment of factors and their factor levels
What is the Control Plan
200
is a “living” communication and governance document
What is the Charter
200
the amount of VA time + the amount of BNVA time + the amount of NVA time
What is PLT or Process Lead Time
200
2 of them are Master the Flow and Pull the Flow
What are the Core Lean Principles
200
Gives Six Sigma teams an opportunity to evaluate and modify solutions before moving to a full scale implementation
What is a Pilot study
200
Attribute chart used to measure Defective items with an inconsistent subgroup size.
What is a P chart
300
helps teams gain the support and cooperation from key players outside the six sigma team.
What is the Stake Holder Analysis
300
they include subgroup drift as well as within subgroup variation
What are PP and PPK
300
Also called a data collection plan
What is Operational Definition
300
Also known as a PICK chart, it is used to aid in prioritization of solutions
What is a Solution Matrix
300
The 3 elements in a process management plan
What Chart/method of monitor, action alarms, and action plan
400
?1. Treated as a static (non-living) document.? and ?2. Questions are vague and not specific enough.
What are typical pitfalls of Mind Maps
400
Repeatability and Reproducibility are components
What is Gage Precision
400
A technique through which we can quantify the strength of association between 2 continuous variables
What is Correlation
400
defined as movement of material from value-added process to value-added process without transport time or storage in buffers.
What is Continuous Flow
400
The variable control chart used for subgroup sizes of 10 or more.
What is X-bar/S
500
to reduce the number of non-value added steps in a process
What is goal/guiding principle of Lean
500
Also known as SIGNAL
What is Special Cause Variation
500
Is used to compare two independent groups.
What is a 2 sample t-test
500
Comprised of at least one run for every treatment of factors and their factor levels
What is a Full Factorial DOE
500
The last step of your project
What is Celebrate.