Lean Fundamentals
Visual Management
Flow & Pull Systems
Quality & Problem Solving
Waste & Value
Lean Tips Challenge
100

 This problem-solving tool documents the issue, analysis, and countermeasures on a single page.

What is an A3 Report?

100

This Lean tool makes performance, standards, and abnormalities immediately visible.

What is Visual Management?

100

This visual pull system controls production and replenishment based on demand.

What is Kanban?

100

This Lean concept means preventing mistakes before they occur.

What is Poka-Yoke (error proofing)?

100

This acronym is used to identify the seven forms of waste.

What is DOWNTIME?

100

 When a problem keeps returning, this likely was not addressed.

What is the Root Cause?

200

 This technique repeatedly asks "Why?" to uncover the underlying cause of a problem.

What is '5 Whys'?

200

 A process where conditions and performance can be understood without explanation.

What is At-A-Glance Status?

200

This metric tells us how much time is available per unit to meet customer demand.

What is Takt Time?

200

This term describes a defect discovered by the customer.

What is an escaped defect?

200

Work that the customer is willing to pay for is known as this.

What is Value-Added Work?

200

 This chart helps teams focus on the "vital few" causes creating most of the impact.

What is a Pareto Chart?


300

This Japanese term refers to the actual place where work is performed.

What is Gemba?

300

This signaling system visually alerts teams to process problems.

What is an Andon System?

300

 This measures the time from customer request to delivery.

What is Lead Time?

300

This quality principle focuses on building quality into the process rather than inspecting afterward.

What is Quality at the Source?
300

 Work that does not add customer value should be eliminated or reduced.

What is Non-Value-Added Work?

300

 This principle creates a stable baseline so problems become visible.

What is Standard Work?

400

 This continuous improvement philosophy relies on small improvements made by everyone.

What is Kaizen?

400

Shadow boards and red tags are examples of this type of workplace control.

What are Visual Standards?

400

This production approach aligns work to actual customer demand.

What is a Pull System?

400

This tool organizes possible causes of a problem into categories.

What is a Fishbone Diagram?

400

Doing more work than the customer requires is called this.


What is Overprocessing?

400

 In Lean, respect for people means engaging these individuals in improvement efforts.

Who are the people closest to the work?

500

This cycle stands for Plan, Do, Check, Adjust.

What is PDCA?

500

Seeing abnormalities early should be considered this rather than a failure.

What is a success?

500

This condition helps problems surface more quickly by reducing waiting and inventory.

What is Continuous Flow?

500

 This method identifies potential failures before they occur and evaluates their risk.

What is FMEA (Failure Mode and Effects Analysis)?

500

 This term refers to inventory currently being worked on.

What is WIP (Work In Progress)?

500

The sequence VOC → CTQ → KPI is used for this purpose.

 What is translating customer needs into measurable performance indicators?