Gas
Electric
Steam
HPI Tools
100

A rule we live by that deals with the process of supporting a structure to prevent a collapse

What is sheeting/shoring?

100

On January 16th, 2004, a 30-year-old Ph.D. student, was killed as she made contact with stray voltage.

What was the Jodie Lane incident?

100

The year the Gramercy Park Incident take place

What is 1989?

100

Responsibility for proper communication is assigned to the originator or sender, who must verify the receiver understands the message as intended

What is Three-Way Communication?

200

For excavations greater than this amount of feet in depth the atmosphere shall be tested prior to entry or when the excavation is not already occupied. 

What is four Feet?

200

High-Hazard PPE & Test for Dead were two violations that took place in this 2023 RWLB violation

What is the 2023 Staten Island Incident?

200

41st St. & Lexington Ave was the location of an incident featuring this commodity

What is steam?

200

Requires workers to simply take time before starting a job to become aware of the immediate work environment

What is the Two-Minute Rule?

300

Heaters were installed at our gate stations due to the loss of life and property during an incident in this section of the Bronx

What is Hells Gate?

300

EO-10322-Contact and Stray Voltage Testing Of Distribution Structures and Streetlights is often associated with this incident

What is Jodie Lane?

300

The amount of Asbestos released in the Grammercy Park Incident

What is 200 Pounds
300

This HPI tool is used when employees must stop and get help when a question is encountered and what to do about it is uncertain.

What is Stop When Unsure?

400

While not in CECONY territory, this over-pressurization event in this region in September of 2018 was caused by a high-pressure system feeding a low-pressure system

What is Merrimack Valley

400

Astoria, Sunnyside, Long Island City, & Woodside were all effected by this in July 2006

What neighborhoods were affected by the Queens blackout?

400

The steam mechanics failed to this during the Gramercy park incident

What is Drain the condensate before turning the steam on?

400

Using this HPI tool helps users to perform activities correctly, safely, consistently, and in accordance with design requirements. 

What is Procedure Use & Adherance?

500

The East Harlem Explosion lead to the formation of this department that reports directly to the Senior Vice President of Gas Operations

What is Gas Compliance and Quality Assessment?

500

Additional diesel generators were installed at various substations throughout the Con Ed system to provide a source of power to ensure feeder potheads maintain adequate oil pressures for re-energization during blackout conditions was the result of this event

What was one change that was made as a result of the 2003 blackout?

500

Since the Gramercy Park Incident the company has been doing this annually

What is replacing traps?

500

Prior to Stopping, Thinking, Acting, and Reviewing, This HPI tool requires you to do this

What is Touch?