CONDUIT BENDING
SUPPORT CODE FACTS
MOTOR CONTROL
RANDOM CODE
blueprints
100

WHAT IS THE TAKE UP FOR 3/4 EMT?

6"

100

MINIMUM SUPPORT DISTANCE FOR 3/4" EMT

3' FROM BOX AND EVERY 10'

100

WHEN WIRING A OVERLOAD FOR MOTOR PROTECTION DO YOU USE N/O OR N/C CONTACTS

N/C 

100

HOW MANY CCC CAN YOU INSTALL IN A CONDUIT BEFORE YOU HAVE TO DERATE THEM?

3

100

WHEN LOOKING FOR EXACT LOCATIONS ON LIGHTS WHAT PRINT WOULD YOU USE?

REFLECTED CEILING PRINT

200

WHAT IS THE TAKE UP FOR 1" EMT?

8"

200

SUPPORT DISTANCE FOR FLEXIBLE METALIC CONDUIT

12" FROM BOX AND EVERY 4 1/2 FEET

200

IS THE STOP BUTTON N/O OR N/C

N/C

200

ALLOWABLE VOLTAGE DROP FOR BRANCH CIRCUITS?

3%

200

WHEN LOOKING FOR EXACT LIGHT POLE BASE PATTERNS WHERE WOULD YOU LOOK?

EITHER SUBMITTALS OR DETAILS

300

WHAT IS THE SHRINK FOR A 22.5 DEG BEND

3/16"

300

SUPPRT DISTANCE FOR 12-2 MC CABLE

12" FROM BOX AND EVERY 6'

300

WHAT ARE NORMALLY OPEN CONTACTS 2 AND 3 SPECIFICALLY FOR ON A MOTOR STARTER?

3 WIRE HOLDING CKT

300

OVER WHAT SIZE CONDUIT NIPPLE DO YOU HAVE TO START DERATING CONDUCTORS

OVER 24"

300

WHY SHOULD YOU ALWAYS CHECK THE REVISION DATE ON BLUEPRINTS?

AS REVISIONS ARE MADE YOU NEED THE MOST UP TO DATE VERSION

400

WHAT IS THE SHRINK FOR A 45 DEGREE BEND

3/8"

400

SUPPORT DISTANCE ON ELECTRICAL NON METALLIC TUBING (ENT)

3' FROM BOX AND EVERY 3'

400

WHAT ARE TERMINATIONS A1 AND A2 ?

COIL TERMINATIONS

400

WHAT IS YOUR ALLOWABLE PERCENTAGE FILL FOR A 24" NIPPLE WITH CONDUCTORS?

60%

400

FIRST PLACE TO LOOK FOR WHO SUPPLIES HVAC DISCO,VFD,STARTER

MECANICAL EQUIPMENT SCHEDULE

500

TAKEUP FOR 1 1/4" EMT

11"

500

SUPPORT DISTANCE FOR MI CABLE

EVERY 6'

500

ON A 8 PIN RELAY WHICH 2 PINS ARE YOUR COIL?

7 AND 2

500

ALLOWABLE VOLTAGE DROP FOR FEEDERS?

5%

500

WHAT IS REDLINING ON A PRINT?

REDLINING THE CHANGES MADE DURING INSTALL FOR THE CUSTOMER TO REFERANCE