Accounting Swagger
Settlement Sense
Eager Energy Economics
Wind and Solar Development TLAs
Raucous regulators
100

A private, non-profit organization standard-setting body whose primary purpose is to establish and improve Generally Accepted Accounting Principles within the United States in the public's interest

What is the FASB - The Financial Accounting Standards Board 

100

a contract between two parties stipulating that the seller will pay to the buyer the difference between the current value of an underlying equity share and its value at expiry date or on date of termination.

What is CFD - Contract for Differences?

100

A measure of the energy content in fuel, and is is used in the power, steam generation, heating and air conditioning industries. Equivalent to1.06 Joules

What is an MMBTU, or MBTU, (stands for one million British Thermal Units (BTU))?

100

A collation of selected weather data for a specific location, listing hourly values of solar radiation and meteorological elements for a one-year period

What is TMY - Typical meteorological year?


100

The independent system operator for the electrical grid of Alberta

What is AESO - Alberta Electric System Operator?

200

A board that sets common rules so that financial statements can be consistent, transparent and comparable around the world. ... They specify how companies must maintain and report their accounts, defining types of transactions and other events with financial impact

What is the IFRS - International Financial Reporting Standards

200

A tracking instrument defined in article 15 of the European Directive 2009/28/EC that labels electricity from renewable sources to provide information to electricity customers on the source of their energy

What is A GO - Guarantee of Origin?


200

the metric that measures operating margins that a new resource would need to earn in the capacity market, after netting margins earned in markets for energy and ancillary services (E&AS)

What is the Net Cost of New Entry (Net CONE)?

200

The assessment of the environmental consequences (positive negative) of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action

What is an EIA - Environmental Impact Assessment?


200

This is the main trade body for US regulated electric utilities

What is EEI - Edison Electric Institute?

300

A method of measuring the fair value of accounts that can fluctuate over time, such as assets and liabilities.

What is M2M - Mark to Market?


300

originally a narrow rule intended to ensure that capacity sellers who are “net buyers” of capacity in the market (such as load-serving utilities) cannot exercise buyer-side market power by developing capacity and offering it into the market at an artificially low price that suppresses overall market prices

What is MOPR - Minimum Offer Price Rule?

300

Also known as off-exchange trading, this transaction type is done directly between two parties, without the supervision of an exchange. It is contrasted with exchange trading, which occurs via exchanges

What is OTC - Over the Counter?

300

a legal contract between the electric utility and customer establishing all terms and conditions associated with moving power onto the grid

What is a UIA - Utility Interconnection Agreement?

300

An independent agency that regulates the interstate transmission of electricity, natural gas, and oil

What is FERC - Federal Energy Regulatory Commission?

400

The face value on which the calculations of payments on a financial instrument (e.g., swap) are determined. In other words, it indicates how much money is controlled by a position on a particular financial instrument

What is Notional quantity or value?

400

a market-based instrument that represents the property rights to the environmental, social and other non-power attributes of renewable electricity generation

What is a REC - Renewable Energy Certificate?


400

a variety of operations beyond generation and transmission that are required to maintain grid stability and security. These services generally include, frequency control, spinning reserves and operating reserves

Ancillary Services

400

normal unit of speed measured by an anemometer

What is M3ps (cubic meters per second)?

Also acceptable: What is a knot? (nautical mile per hour = 0.51 m sec-1 = 1.15 mph) 

400

A United States Act passed as part of the National Energy Act. It was meant to promote energy conservation (reduce demand) and promote greater use of domestic energy and renewable energy (increase supply).

What is PURPA - Public Utility Regulatory Policies Act?

500

Also known as the Santiago principles, are standardized business procedures related to the operation of sovereign wealth funds (SWFs), which have agreed to pursue financial rather than political agendas and maintain a stable global financial system

What is GAAP - generally accepted principles and practices?

500

A market participant or its chosen representative responsible for its imbalances in the electricity market

What is BRP - Balancing Responsible Party?

500

A financial market where market participants purchase and sell electric energy at financially binding prices for the following day

What is A Day-ahead market?

500

A way for wholesale electric energy prices to reflect the value of electric energy at different locations, accounting for the patterns of load, generation, and the physical limits of the transmission system

What is LMP - Locational Marginal Pricing?

500

A regulation that requires the increased production of energy from renewable energy sources, such as wind, solar, biomass, and geothermal

What is RPS - A renewable portfolio standard ?

Also acceptable:

(Renewable Electricity Standard (RES) at the United States federal level and Renewables Obligation in the UK)