Tables & Graphs
Slope & Rate of Change
Equations of Lines
Coordinate Plane & Quadrants
Real-World Applications
100

What is the independent variable in a table of values?

x
100

What is another word for slope?  

Rate of change

100

In the equation y = 3x + 4, what is the slope?

3

100

Which quadrant is (-3, 5) in?

Quadrant II

100

If a taxi charges a $3 base fee plus $2 per km, what is the equation?

y = 2x + 3

200

What is the dependent variable in a table of values?  

y

200

Find the slope between (2, 3) and (4, 7).

m = 2
200

In the equation y = -2x + 5, what is the y-intercept?  

5

200

Which quadrant is (4, -7) in?

Quadrant IV

200

A gym membership costs $20 per month after a $50 registration fee. What is the equation?

y = 20x + 50
300

If a table of values shows x increasing by 1 and y increasing by 3, what is the slope?

3

300

What does a slope of 0 mean?  

The line is horizontal

300

Write the equation of a line with slope 4 and y-intercept -2.

y = 4x - 2 
300

What is the y-coordinate of any point on the x-axis?

0
300

If a phone plan costs $30 plus $0.05 per text, how much for 100 texts? 

$35
400

If a table of values shows the following points: (1, 2), (2, 4), (3, 6), what is the equation?

y = 2x

400

If a line has a slope of -3, how does it move?  

Down 3 for every 1 step right

400

If a line passes through (0, 3) and (2, 7), what is its equation?

y = 2x + 3

400

What is the x-coordinate of any point on the y-axis?

0
400

A machine produces 10 items per hour. If it starts with 50 items, what is the equation?

y = 10x + 50
500

A graph shows a straight line going down from left to right. Is the slope positive or negative?

Negative

500

A car travels at 60 km per hour. What is the equation for its distance after t hours? 

d = 60t

500

What equation represents a line parallel to y = 5x - 1?  

Any equation with slope 5, e.g., y = 5x + 2

500

What is the midpoint of (2,4) and (6,10)?

(4,7)
500

A plumber charges a $40 service fee plus $25 per hour. What is the equation for the total cost, C, after h hours of work?  

C = 25h + 40