Red
Purple
Blue
Yellow
Orange
100

What should you do if encountering a situation where an excavator has no locates but isperforming work?

Contact Damage Prevention

100

If the direct connect (conductive) method of locating does not work, what other two means can be used?  (Select all that Apply)

Induction and Measurements

100

If a locate is found to be incorrect, what must be done to the incorrect markings?

"Blackout" incorrect markings with black paint

100

If a gas leak is discovered at any time during a locate performance, what should you do?  Select all that apply  (LPQ)

Call 911 and Call Centerpoint Dispatch 

100

According to the DOT pipeline safety regulation section 192.481 operators must inspect offshore pipelines for atmospheric corrosion:    

Once every calendar year not to exceed 15 months

200

All pipelines 2" or greater must be noted and the material type placed when known.........  What is the correct placement for a 12" Steel pipeline operating at 200 psig?

CPE 12" HP STL

200

Notification is to be sent for any High Profile facility (pipeline operating over 60 PSIG) within how many feet of the locate request?

60ft

200

This is a 'first cut" or regulator set situated between the HP gas main and the gas meter at the house. Usually found in rural settings. 

Farm tap

200

If an unlocatable or high profile pipeline is within the scope of an emergency locate request that is to be performed outside of normal working hours, what should you do? Select all that apply.

Follow the High Profile Policy and Call Centerpoint dispatch if unlocatable

200

According to DOT pipeline safety regulations section 192.481 if atmospheric corrosion is found during an inspection, the operator must    

provide protection against the corrosion as required by 192.479

300

This type of installation is the most common method for installing underground facilities

Direct buried

300

What must you fill out and get signed by the contractor in order to change the scope of the ticket?

Meet sheet


300

All pipelines 2" or greater must be noted and the material type placed when known.........  What is the correct placement for a 4" plastic pipeline? (LPQ)

CPE 4" PL

300

According to the DOT, each operator must use a suitable coating material to prevent what?

Atmospheric Corrosion

300

There are four parts of a corrosion cell.  They are    

Cathode, Electrolyte, Anode and Metallic Path

400

If a property does not have a Centerpoint facility within the scope of the ticket, what must be placed on the soft surface?

CPE OK with a Flag in the center of the words

400

When do you place an M with a circle while locating?

When locating with measurements

400

If a facility cannot be located (untoneable), what must be placed at the location?

Unlocatable Marker or Flag

400

According to DOT pipeline safety regulations section 192.481, operators must inspect onshore pipelines for atmospheric corrosion...

Once every 3 years not to exceed 39 months

400

Coating disbondment is defined by NACE as  

the loss of adhesion between a coating and the pipe surface

500

How many access points are required to preform a locate on a High Profile facility?  

2

500

How deep must you dig in an effort to find a locate wire when one is not visible?

18inches 

500

What should the approximate distance between locate markings?

10ft

500

According to the DOT each operator must _________ and __________ each pipeline or portion of pipeline that is exposed to the atmosphere, except pipelines under OPS Subpart I 192.489 paragraph (C)  

Clean and Coat

500

When inspecting for atmospheric corrosion, if the coating is disbonded  

Visually inspect the steel surface under the disbonded coating