Pre-Shift Huddle
Check and Adjust
Post Shift Huddle
Management System
Potpourri
100

This person facilitates the pre shift meeting

Who is the production controller

100

This is the recommended max length each check and adjust should be

What is 20 minutes

100

This meeting should start no later than this past the end of shift

What is 15 minutes

100

Management System is a framework of connected routines, processes, and tools that support teams in achieving Target's purpose - which is to help all families discover this in everyday life. 

What is Joy

100

The proper way to say Jared's title

What is Senior quality CI manager

200

Every Meeting starts with this

What is a Safety Tip

200

The purpose of the C&A meeting is to monitor performance to plan and adjust if necessary. It also builds the foundation of data needed for this.

What is post shift recap

200

Observations and action items for post shift recap should be drawn from this

What are check and adjust meetings

200

This is what ABIC stands for

What is achieving best in class

200

This is the year this building opened

what is 1996

300

This is one of the purposes of the pre-shift meeting - to create ________ total building flow

What is balanced

300

After the PC this is the first department to report out during a check and adjust meeting

What is E&F

300

The observations and action items gathered in the post shift meeting are the foundation for this

What is DBR

300

The components of MS are as follows: standardization, process excellence, and this

What is problem solving

300

This is the first Star Wars movie ever made

What is Star Wars a New Hope. 

400

Prior to each pre-shift meetings the OM will do this to assess current department conditions

What is a building walk or peer handoff

400

Daily Double 

Can wager up to double your score (in multiple of 400)


If a metric is out of threshold the OM should be prepared to speak to these two items

400

Department plan attainment outside of tolerance should have a detailed breakdown of cartons lost using this

What is the bridge calculator

400

This is the term that refers to the connection between all elements of MS - from the field ops business plan all the way down to process boards. 

What is the Golden Thread

400

This is the nickname for the state of Oregon

What is the beaver state

500

The plan each OM provides will include the following details: Planned volume by process path, planned hours by process path, planned CPH by process path and this. 

What is WIP status relative to UCL/LCL

500

If gaps exist and countermeasures have not been identified, than OMs should seek this. 

What is - they should seek their peer group for collective problem solving

500

This is the last item on the agenda for the post shift meeting

PC summarizes countermeasures and future actions

500

One of the stated purposes of MS is to create a culture of this

What is continuous improvement
500

This is Grant's middle name

What is Kristopher