Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
100
  1. The machine process used to make a hole more precise is called


    1. Reaming

100
  1. A force that makes an object rotate about a point is called


    1. pivot force

100
  1. Which phase best describes order cycle time? From when______ to when _____


    1. elapsed time from customer order to the time product or service is rendered

100

Mistake proofing a process or design of a product is called?  And it is not Pikachu. 

Poka - Yoke

100
  1. A bottleneck constraint is

  1. something that limits system throughput

200
  1. A drill with a work margin will


    1. drill undersize

200
  1. A mandatory perquisite for team building is________. Some call it top down.


    1. commitment from top level management

200
  1. If a company is operating under a continuous improvement environment,which of the following is probably the primary goal?  The Japanese call it Muda. 


    1. identify and eliminate waste (non-value added)

200
  1. A workstation needs only two operators to run efficiently but there are general three operators assigned to this workstation. A new product requires a new process and one operator. The manager/supervisor should


    1. reassign one of the operators from the overstaffed workstation

200
  1. A production schedule can determine whether delivery promises can be met and can identify_____________.  I hate when Amazon uses the foam peanuts 


    1. when packaging material will be required for a product

300
  1. The primary purpose of a "first piece" or "production run" is to ensure that the


    1. production specifications are accurately met

300
  1. Within a company, a metric is used to _____________.  Don't step on it or the other team will get the ball.


    1. establish a baseline measurement for process improvements

300
  1. Calculate the productivity in units per hour of a worker given the following information

  2. 12.5


    1. 12.5 parts per hour

300
  1. If a customer requests 100 parts and the team can only produce 80 in the amount of time allocated before shipment, which of the following is the preferred method for the team to use to reduce the shortfall?


    1. re-allocate equipment and human resources

300
  1. The Japanese use this word for continuous Improvement 

  1. Kaizen

400
  1. The size of a drill is usually stamped on its


    1. Shank

400
  1. Objectives should be________.  Or the second letter of SMART Goals


    1. Measurable

400
  1. Which of the following is used by companies to maximize the use of available skills in assigning jobs?


    1. training matrix or database

400
  1. Job assignments should be made By asking whom____________


    1. by asking the supervisor

400
  1. Management and leadership are both necessary on projects. One typical task of management is to prepare key operational results expected by stakeholders, whereas leadership involves


    1. establishing direction, aligning people, and motivating and inspiring others

500
  1. When setting up equipment for the production process, it is important that


    1. process requirements and product specifications are met

500
  1. Team goals should be tied to


    1. the company's business plan

500

The primary responsibility of a team leader is


    1. knowing all team skills

500
  1. A lean manufacturing technique that focuses on creating a clean and orderly work area is __________. There is one for every finger

5S

500
  1. A team should use __________ to solve a non-conforming product problem


    1. root cause analysis