MPM-11-038-CHM
What operation am I?
MRFDLR takes time!!!
The world runs on manufacturing!
MPM-11-098-CHM
100

When in the cleanroom, where shall an employees badge be secured?

Badges shall be secured under a smock

100

Boy do I love to align! At this operation I use a fancy new fixture to make myself the perfect size! What operation am I?

WI13717869G1 Operation 0850: Align Unit

100

What is the approximate span time (in weeks) for the Top Assembly Build?

1 week 

100

True or false, an average car is made of more than 30,000 individual parts

True

100

How many Flexprint Assemblies can be placed in a package together?

1! Each package shall contain a maximum of ONE Flexprint Assembly. 

200

What is the minimum number of times a workstation shall be cleaned a day?

Two times. Workstations shall be cleaned minimum two times per day: at the start of the shift and at the end of the day. 

200

At this operation I become classified. I use a fancy press block during my cure. After this operation, I head to bond for some fancy new ribbons! 

WI13717916G1 Operation 0300: Epoxy Substrates

200

How long is final ATP (in hours) on the Top Assembly?

5.5-6 hours (any answer in this range is acceptable)

200

True or false, semiconductor cleanrooms where microchips are made are 1000 times cleaner than a hospital operating room

True!

200

If a unit is dropped, who should you contact immediately?

Supervisor, ME, or QE

300

What FOD Classification is the Chelmsford machine Shop?

FOD Awareness

300

I used to be done at the top assembly level, but I've recently moved to the digital!!! A stencil is used and I get a fancy new look on my cover!

WI13717878G1 Operation 1600: Install Cable Tie Mounts

300

What is the approximate span time in weeks for the Digital Build?

7 weeks

300

When bubble wrap was originally invented, what was it used for?

Home decor! It was originally invented in 1957 as textured wallpaper. It later found massive success as protective packaging 

300

True or false: Suitcase style boxes cannot be stacked on top of benches.

True! Do not stack suitcase style move safe boxes on top of benches. 

400

Name 5 Items that are "Prohibited Chelmsford Cleanroom Items"

Paper clips, cork material, Spiral Books and Notebooks, Perforated Notebooks, Wooden Pencils, Mechanical Pencils, Rubber Erasers, Food, Candy, Gum, Mints, Beverages, Plants, Flowers, Winter Hats, Silicone Based Wearable Items, Glitter, Personal Hand Sanitizers

400

I CAN FEEL THE HEAT! At this operation the RF slice gets extra toasty in the SST. Solder preforms are used and blisters may form.....

WI13717872G1 Operation 0200: Solder Feedthrus

400

What is the approximate span time (in weeks) of the RF Build?

11 weeks

400

Which US state holds the largest manufacturing plant on Earth?

Washington! 

400

How many people are required to move a single bay test stand?

Single bay test stands require a minimum of two persons to move.  

500

Name 5 items that are considered "Limited Chelmsford Cleanroom Items"

Sticky notes, Loose Staples, Loose Binder Clips, Staplers, Paper Hole Punchers, Loose Hardware, Loose Torque Driver Bits, Foam, Pink Antistatic Foam, Corrugated Cardboard, Non-Corrugated Cardboard, Aerosols, Spray Bottles, Lotions, Paper Towels, Tissues, Pre-Saturated Cleanroom Wipers, Hair products, Perfume, Cosmetics, Cough Drops

500

Woohooo! We made it to the end! Time to graduate to the midsection! But before I go, there's one very last step before I hop on the truck. What operation am I?

WI13717869G1 Operation 8700: Pack Unit in Corrugated Shipping Box

500

CCAs get populated in the heart of Texas (also known as Lufkin). How many weeks does it take for them to populate a batch of CCAs?

3 weeks 

500

Who is the largest tire manufacturer?

LEGO! The toy company produces over 700 million miniature rubber tires every year

500

When removing carriers from WIP box insert, ____________ shall be used to remove FOD prior to loosening any screws

A micro-vacuum. 

9.7 For removal of carriers from the WIP box insert, use a micro-vacuum to remove any FOD from the perimeter of the carrier and inside each screw hole that is not being used. Then back-out the screw(s) about ½ way and a micro-vacuum to remove any FOD from the screw threads. Use caution during these steps to ensure that the vacuum tip does not damage the carriers components and/or wirebonds