EQUIPMENT
TRAINING/
INSPECTION
ELECTRICITY
BEFORE YOU START
RANDOM
100

What should be done before operating equipment?

Pre Inspection

100

How many hours of safety training is required for a new surface miner? 

24 Hours 

100

LOTO stands for?

Lock out tag out

100

What is the minimum PPE required to work on an MSHA governed site? 

Hard hat, steel toed. shoes, and safety glasses. 

100

______ _______ authority is given to all worker and can save time, money, and lives if used properly? 

Stop Work 

200

If you are not wearing this while operating you personally can be fined?

Seat Belt or Safety Belt 

200

How often must miners receive REFRESHER training and what is the duration of this training?

Annually and Eight (8) Hours 

200

According to MSHA regulations, all electrical repairs must be performed by this person. 

A Qualified Electrician 

200

What training should be done for any new miner or third party person entering the mine?

Site Specific Training 

200

____________ energy is an example of a "Hidden hazard" that may not be obvious? 

Stored or Potential 

300

What should be placed on either side of one tire when equipment is parked? 

Tire Chocks 

300

MSHA must inspect a surface mine at least this many times each year? 

Twice (2) 

300

Who removes a lock or tag? 

Person who applied it. 

300

What inspection should be done in your area before work starts? 

Site/Area Inspections 

300

Working at ______ kills more workers each year than any other? 

Heights 

400

This is required if your work truck is parked anywhere on site

Parking Brake Applied 

400

Part 46 are the MSHA rules governing what?

Surface Mines 

400

A shock involving as little as _____ volts can be fatal. 

40 Volts

400

A miner must receive this type of training based on scope of work performed? 

Task Specific Training. 

400

What should be done if a coworker is observed working unsafely? 

Address it, stop it, or report it. 

500

You are assigned a loader that has a fire extinguisher mounted, but the pressure gauge reads in the red. The extinguisher is still physically present.

MSHA requires you to do what?

Tag the equipment out of service until the extinguisher is serviced

500

A contractor is on-site for one day to repair equipment. What training must they have?

Site-specific hazard training

500

After a crushing plant is relocated, what electrical test is required before operation?

An OHMS-to-ground (ground resistance) test must be performed.

500

What is the first thing you do before working on a broken belt, crusher, or piece of equipment?

(LOTO) LOCK OUT TAG OUT (for everyone involved) 

500

What does MSHA stand for? 

Mine Safety and Health Administration (MSHA)