DESIGN ADJUSTMENTS
PuA
UPDATES
CROSS
DEPT COMMS
SDS
COMMS
INTERNAL
COMMS
100

Fill in the blank

The Design Adjustments Process will be used when an opportunity requires a design change, that does not affect the ________ or the ________.

System Size & Total Sales Price

100

If we need to create a Change Order Agreement, where can we find the steps or actions needed?

PuA - Step by Steps

100

What is the Case Origin used when creating a Case?

Web Link/Podium

100

A Specialist has assigned you a High Priority case. When does the case need to be completed?

The day of

All high priority cases, whether it be CROSS DEPT COMMS, SDS COMMS, OR INTERNAL COMMS, need to be completed within the same day

100

What logs should ALL Internal Comms include?

INTERNAL COMMS, CROSS DEPT COMMS, & HASHTAG LOG

200

When is the Design Adjustment Process needed?

EC, Customer, etc. Requests

Design Review Process

Post Install Process

200

What automatically applies our Panel and Inverter Module Counts?

Uploading our Aurora Design screenshot

200

What is the correct format used for the “Post Tab”?

CROSS DEPT COMMS - OPPORTUNITY LINK

200

An opportunity’s design review has been completed and is ready for CAD within 24 hours. What is the Subject Line used here?

SD | Design Review - Ready for CAD

200

When will we create an Internal Comms case?

When navigating negative savings

300

What is the Design Adjustment label for a Post Install?

PA - SLR: First Last - City, State - #1; ________

DA - #1 - Panel Install Varies

300

An EC requested a design change. Once the request is completed, what is the correct format for our response?

PuA #X is ready to go with [changes were made]!

300

What statuses would be used for the following cases?

1. SD | SMS Reschedule

2. SD | CAD Revision Inquiry 

3. SD | Best Offset Solution

1. SD | SMS Reschedule: New

2. SD | CAD Revision Inquiry: Working

3. SD | Best Offset Solution: Closed

300

What is the first step when we’ve received a Redesign or Learning Opportunity case?

Adjusting the status to “Working”

300

Which is the correct description for SD | Eliminate Trenching?

1. Eliminate Trenching | Navigating Negative Savings

2. Negative Savings | Trenching

3. Navigating Negative Savings | Eliminate Trenching

4. NNS | Eliminate Trenching

Navigating Negative Savings | Eliminate Trenching

400

We need to link our Design Adjustment in SF. Where can we find the Design App Design ID?

Between "designs/" and "cad/" in the Aurora URL

400

SE reached out with, “We will need a regular P&I here for the updated notes because the TSP isn't changing. PuA #2 is for a change order, can we get this updated to be P&I?”. The current PuA is in “Active Signed”. When does the P&I button appear in a PuA?

The P&I button will appear in a PuA when the PuA is created from an inactive PuA!

400

An ESC requests a CAD Revision through chatter. What are the two comments needed in the CROSS DEPT COMMS?

1st Comment: Screenshot of ESC Request + Date

2nd Comment: “Requested to RA for Revision!”

400

What cases are Medium Priority?

Pitch Discrepancy, Panel Addition, & CAD Stage Change Error

400

If we know the customer’s home is not a good fit for solar without Tree Removal, and we create an SD | Tree Removal case, what two comments must be included in Internal Comms?

1. Tree Removal Talk Track

2. Uploads/Additional Information

500

What information needs to be copy and pasted from the Active - PuA to the Design Adjustment?

Design App Project ID

Design App Design ID

Design 3D Render URL

500

Two-Part Question

The PuA Products in SF show 18 inverters, but the design only requires 15. Which fields in SF need to be updated to correct this discrepancy, and what value should be entered in the Panels button to adjust the inverter count?

Fields Updated: Quantity of Arrays, Number of Panels Assigned to Array, Compass Directions Assigned to Array, & Pitch Assigned to Array.

Value Entered: 0

500

An EC reaches out in chatter, “Please drop this to a 93% offset” but the appointment is non-urgent. After we’ve created a PuA and adjusted Aurora and SF, what would be our next steps?

1. Create a new Case

2. Create CROSS DEPT COMMS & send response to request

3. Create HASHTAG LOG & send hashtag

4. Respond in initial chatter “This has been moved to this case!”

500

What are the steps from receiving the following scenario to closing the case?

“Please adjust the status to “Working”, create a new Design Adjustment labeled as “Panel Arrangement”, and make the following adjustments:

  • Is there any way we can avoid busting an 18 panel array here?"

1. Change the case status to Working.

2. Create a new Design Adjustment labeled Panel Arrangement

3. Make design changes in Aurora

4. Confirm the accuracy of the design changes with the Specialist

5. Update SF & Files

6. Set the Design Review Field to Redesign Completed

7. Create CROSS DEPT COMMS & send the Design Review Recap

8. Close the case

500

If our ATL approves removing the Electrical Upgrade cost from the TSP due to negative savings, where should the SD | Electrical Upgrade NOT Added to TSP talk track be sent?

In the CROSS DEPT COMMS within the SD | Remove E/U Cost case