Chap 1-4
Chap 5-8
Chap 9-12
Do you feel Lucky
100

The floor area for each floor must be calculated from the outside dimensions of the building, dwelling unit, or other area involved.

True

100

What boxes are used primarily to install ceiling outlets.

Octagonal

100

Even though multipair conductors are no longer used extensively in telephone installations, the size of the raceway should be trade size ____ or larger

3/4

100

What is the multiplier for a 45 degree bend

1.41

200

Who may submit public input to change the NEC® (NFPA 70) based using the online public input process?

anyone

200

When sizing feeder conductors, ____ noncoincident loads (loads unlikely to be operated simultaneously, such as the air-conditioning and the heating) need to be included

only the larger of any

200

The luminaires installed for the stairway to the second floor and hallways are in continuous operation when the building is occupied since those spaces do not have windows for possible ambient light from outside. The power to these luminaires is supplied directly from the building owner’s panelboard, commonly called the ___________ panelboard.

House or owners

200

What was the hose we ran in welding for

Oxygen supply

300

Which type of branch circuit has two or more ungrounded conductors, which have a voltage between them, and a neutral conductor that has an equal voltage between it and each ungrounded conductor of the circuit and that is connected to the neutral conductor of the system?

multiwire

300

When referring to motor controllers in the United States, we prefer to use the term ____ instead of coordination because coordination has a different meaning.

protection

300

With a “____” elevator, the entire elevator lifting mechanism is located in the elevator shaft, either on the elevator cab or on the wall

machine-room-less

300

How many circuits were ran in the boiler lab

2

400

What is the purpose of a branch circuit worksheet?

Branch-circuit worksheets are used for organizing load calculations, including all the temperature correction or number of current-carrying conductor adjustment factors that apply

400

An acceptable impedance for the grounding path associated with normal equipment grounding for branch-circuit wiring is ____ ohms.

1 to 2

400

The combined size of the conductors, splices, and taps shall not fill more than ____ of the raceway at the point where the splices and taps occur.

75%

400

How much does Mayer weigh

150 lbs (maybe)

500

What is an example of a thermoplastic insulation 

THHN

500

A 10 horsepower 240-volt single-phase swimming pool recirculation motor has a service factor of 1.30 permitting the motor to operate at a much higher load since the user may not clean out the filter or scupper of the pool when full of debris and leaves. The 10-horsepower motor marked with a service factor of 1.30 may be loaded to ____ horsepower.

13

500

In general, panelboards are constructed so the ____ run vertically for nearly the height of the panelboard.

main feed busbars

500


The letter M