Ch7
Ch10A
Ch10B
Ch10C
100

What does FIFO stand for and describe what this is 

First in First out

100

What is the first step in a facility design project?

 Prepare a prospectus

100

In the ______ drawing, equipment is drawn to scale in each work unit with required traffic aisles and work spaces included.

Schematic

100

____ is essential for the efficient use of labor. It requires that workers have as little difficulty as possible moving from task to task and that the tools, supplies, storage, and equipment that they need to do each task are close at hand.

Work Flow

200

What temp should frozen products be stored at?

Between 0-10 degrees 

200

The collection of data about the market and other factors relating to the operation of the proposed facility

 feasibility study

200

The slogan “Lean is Green” as it applies to the design of foodservice means:

shrinking the kitchen space or meeting volume demands with less space

200

______ involves considering both the type of energy to be used and how efficiently it is used.

Energy use

300

Name 3 things that would be included on a receiving record

Pg195

300

This is key to equipment needs, which in turn determines space requirements for the equipment

The menu

300

The _____ ___ _______ ___ protects the right of those with disabilities to enjoy and have access to employment, transportation, public accommodations and communications.

ADA  Americans with Disabilities Act 

300

___________ often requires negotiating the best balance among finite resources such as space, labor and money.

Resource maximization

400

What is a running record of the balance of product in stock?

perpetual inventory

400

The first step in design development is to determine optimum space allowances and draw a...

 flow diagram showing the location of the work units

400

The 7 major work areas in foodservice departments are receiving, storage and issuing, pre-preparation, serving, ware washing and:

 support services

400

______ refers to the ease with which customers can move around the facility.

Traffic flow

500

What is an actual count of items in stock 

physical inventory

500

What are some examples of supporting services in a foodservice facility?

Employee restrooms, lockers, showers, hand washing facilities

500

A detailed checklist that would reveal any defective, substitute or inferior equipment so that corrections could be made before an opening or training date for a new or renovated facility.

Punch List

500

A written plan for a building/designing project that details all elements of the situation being planned, used as a guide and communication tool to aid clear understanding by all who are involved in planning

Prospectus