MSI
Midwest Solutions Inc
Solar Panels are powered by?
The Sun
What is Trebor's Last Name?
Verwey
What Panels do we have with MSI?
Jinko 425's
What equipment stores access energy?
Batteries
MPU
Main Panel Upgrade
What do we sell?
Solar
What Door-knocking App do we use?
Canvass
What Amperage is most recommended to go Solar without requiring an MPU?
200 AMP
Which Solar Program deals with APR/Interest Rates?
Loan/Purchase
PPW
What kind of bill is a ComEd Bill?
Electric Bill
What is the FIRST thing we need to do during a consultation if HO's are interested and want to move forward.
Run Credit
How much is MSI's MPU Adder?
$2,500
What Percent is the ITC?
30%
ITC
Why do we need to see a ComEd Bill?
To build a design based off the usage.
3 Common ways HO's sign up for Solar
(3 Different Options)
PPA, Loan, or Cash
Perfect World; No Adders.
Rep Baseline is at 2.8. Sold Job at 3.5PPW. System Size is 13.2. How much is their commission?
-Self Gen
$9,240.00
What is Net Metering?
Process of Sending/Receiving Energy from Utility Company.
EPC
Engineering, Procurement, and Construction
Where is Midwest's FIRST Solar Office Located?
Antioch
What do we schedule after signing a HO up for Solar?
Site Survey
What Doc is signed first when closing?
IL Disclosure Form
How much money does HO need to put down for Loan Purchase?