Checks and Balances
More Checks and Balances
QMS Status
100

When you check ink pH, you use this tool.

What is an electronic pH meter?

100

This lists every step on how to do a particular quality check, but does not tell the frequency of the checks

What is a SPI or Special Procedures and Instructions document?

100

All of the test sets in that group passed.

What is "pass"?

200

This test is done because if a product gets mixed, the customer might not catch it, and might call for a recall.

What is a line clearance test?

200

When you check Liner Temperature, you use this tool.

What is a an infrared pyrometer?

200

At least one of the test sets in that group failed.

What is "fail"?

300

You'll use this to mark the center of the scores to assist with measurement accuracy when performing a measurement for inside dimensions.

What is a pen?

300

Setup checks are triggered at this time. 

What is done as soon as you put the order in process?

300

No tests in that group are due just yet, but will be due within the next 10 minutes

What is "candidate"?

400

The box, after you make up a box is put there. 

What is put on top of the unit afterwards?

400

The frequency and tolerances of the checks are displayed here. 

What is displayed in the in the Inspection Matrix, which is on my Converting PC's desktop, for quick reference. 

400

The test group is due right now and data can be entered.


What is "Due"?

 

500

This type of inspection should be done when either a cutting die or a printing plate is causing a quality defect OR causing you to reduce the machine speed. 

What is a converting tooling inspection?
500

True or False: The Gel Point of adhesive is the temperature at which the adhesive's starch granules swell and turn the adhesive from a liquid into a solid, thereby creating a bond between the liner and medium papers. 

What is True!

500

The test group has passed the optimal point where data can be entered (but still do it!)

What is "overdue"?