Multiplication
Division
Random
Multiplication Word Problems
Division Word Problems
100

12 x 6 = ___

72

100

144 / 6 = ___

24

100

Who brought donuts today?

Vincent

100

A team of 5 masons can install 52 large panels a day. How many can they install in 14 days?

728 Panels

100

A truck delivering equipment to a distant job site travels 468 miles in 9 hours. At what speed is the truck being driven?

52 mph

200

35 x 48 = ___

1,680

200

487 / 46 = ___

10 r27

200
Where did I go to high school?

Belvidere High School (BHS)

200

To install the masonry panels on a 62 – story building, 134 specialized anchors are needed per floor. How many specialized anchors are needed for the entire job?

8,308 specialized anchors

200

A large truck load of stone slabs weighs 21,812 pounds. There are 38 typical slabs on the truck. How much would each slab weigh?

574 lbs per piece

300

678 x 876 = ___

593,928

300

161 / 7 = ___

23

300

How long is this program?

10 weeks, 1 year case management

300

According to the blueprint, 24 anchors are needed at each of 36 column connections. What is the total number of anchors needed?

864 anchors

300

Last year, a Pointer-Cleaner-Caulker made $42,600 working at a rate of $24 per hour. How many hours did he work last year?

1,775 hours

400

2,569 x 856 = ___

2,199,064

400

3,744 / 156 = ___

24

400

What does MC3 stand for?

Multi-Craft Core Curriculum

400

Steel plate that is 1/4" thick weighs 10 pounds per square foot. How much does a single 3' × 7' plate used on a stair platform weigh? Note that the number of square feet is found by multiplying 3' × 7'. What is the weight of a shipment of 38 plates?

7,980 lbs

400

There are 320,000 brick to be installed on a job, estimating that each bricklayer will lay 800 brick per day, how man-days will it take to complete the building?

400 days to complete

500

8,500 x 63 = ___

535,500

500

6,789 / 1,083 = ___

6 r291

500
How old is Kimbo?

32

500

What is the total estimated labor cost to install 40 units of epoxy terrazzo if it takes three terrazzo mechanics 4 hours each to install a unit, and the hourly rate is $45.00?

$21,600

500

The first floor pour of a job will require 220 cubic meters (a metric unit of measurement) of concrete. If a typical truck can carry 4 cubic meters of concrete, how many truckloads of concrete will need to be sent to this job?

55 truckloads