Rig Knowledge
Oilfield Related
Well Control
General Knowledge
Safety Capacity
100

Horn Blast on rig floor, what are they?

1- Long horn blast

2- Long horn blast 

3- Long horn blast 

4- One-second horn blast 


1- Well Control 

2- Fire/ Man-Down/ Spill 

3- Evacuation 

4- All Clear to Resume Operations 

100

The first successful commercial oil well ever drilled was how deep?

69 1/2' Deep

100

Why are accumulator bottles precharged with nitrogen instead of compressed air?

Nitrogen is dry, compressed air creates moisture.

100

What household breaker usually protects outlets near sinks, bathrooms and anything outdoors? 

GFCI

100

When you encounter one you need to Stop the job?

Error Prone Situation 

200

What are the manual locking screws on the BOP bonnets used for & when do you lock them in.

When the rams need to remain positively closed, in case you have a hydraulic pressure loss. 

200

Abbreviation OMW. What is it?

Original Mud Weight

200

You're making a connection; you start the pumps back up with full circulation. You attempt to rotate but can't; you attempt to pick up but can't. How are you stuck?

Differentially 

200

What does the WD stand for in WD-40?

Water Displacement

200

These are planned interrupters to slow us down?

Hold Points and Triggers 

300

Brake air supply tank under the rig floor. What is the PRV set at?

150 Psi

300

What company developed the first RSS tool?

Cambridge Drilling Automation

300
Casing with a solid float is run in the hole without being filled. While tripping in the hole at 3000' MD, the float fails and mud u-tubes. What happens to BHP?

Decreases. 

300

What is the boiling point of water?

212°

300

The best way to capture things that went well and what could be improved after a job

After Action Review (AAR)

400

What is the measurement from RKB to the mats?

30.20

400

What year was drilling mud introduced to drilling oil wells?

1922 by James A. Stroud when he introduced barite as a weight material.

400

Your drilling along, SPP starts to climb rapidly. At the same time, torque increases, returns decrease and hook load decreases. Pump strokes have not changed. What is happening?

Hole is packing off. The combination of increasing SPP, torque, decrease in returns and hook load decrease due to hydraulic lift. 

400

In engines, such as motorcycles, what does the CC stand for on lets say a 107CC engine?

Cubic Centimeters

400

These are the 3 steps for a LMRA

STOP to recognize risks 

THINK of ways to control the risks

ACT to perform the work safely 

500

Why is a marker joint ran in production string casing?

To be able to identify a known depth down hole, usually for logging purposes.

500

Why can we just not make a viscosity in drilling fluid as high as we want it?

You come across increased circulating pressures & ECD's.

500

You have 2 wells one 25,000' TD with a 14,000' TVD & one drilled to 22,250' TD with a 14,000' TVD which one requires a heavier kill mud weight?

Neither. Kill mud weight goes off of TVD. First well will just be more volume. 

500

What does SAE stand for when talking about tools and motoroil?

Society of Automotive Engineers

500

These 4 steps make up the PSMS strategy

Step 1 - Recognize 

Step 2 - Engage 

Step 3 - Verify and Validate 

Step 4 - Learn and Improve