TECH
Site
General
Wire
Random
100

what measure the boom relative to horizontal 

Boom angle indicator 

100

Equipment must not be _______ unless ground is firm, drained, and graded. 

Assembled and operated 

100

What is the rated percentage of tipping when working on rubber?

75%

100

What is the design factor for a standard wire rope in terms of hoist/lifting services?

3.5

100

Cranes should be leveled within what percent of grade?

1%

200

Means any device that expands the range of tasks that can be done by the equipment 

Attachments 

200

The controlling entity must do what before allowing equipment to set up?

Ensure that ground preparations meet equipment requirement specifications for adequate support and degree of level.

200

What is the minimum clearance for counterweight distance near structure?

2 feet

200

What are signs of distortion in a wire rope?

Kinking, crushing, signs of core failure

200

What is the required clearance from a power line with 215kV?

20 Feet

300

Term used to define when the hook block comes into contac with boom tip

Two blocking 

300

What’s the first thing an operator should look at when arriving to a new location?

Access roads 

300

What is the deduction when using a man basket?

50%

300

When is a frequent inspection done on wire ropes?

Before each shift

300

Who’s gives hand signals to crane operatir?

Person assigned prior to lift. 

400

is created when the load is applied to crane, taking slack out of pendants, hoist lines, or telescopic boom sections, slightly bending it. 

Boom deflection 

400

Who should you speak to if possible underground utilities are present?

Local utility company

400

How do you determine your clearances for counterweights and outriggers during crane set up?

Load chart 

400

What percent of the nominal diameter is a wire rope deemed unusable?

More than 5%

400

When are personnel not required to wear a harness in a man basket?

Over water 

500

An angle of inclination about the traverse of a barge, pontoon, vessel or other means of floatation.

Trim

500

When power lines are present, where should warning signs be placed?

In crane operator view and working area 

500

LMI should be installed on cranes with a lifting capacity of 

3 tons 

500

How long are employers required to keep documentation of wire rope inspections?

12 months 

500

how much can a crane capacity decrease by being 3 degrees off level?

Up to 50%