SITE
TECH
OSHA
WIRE ROPE
LOAD CHARTS
100

Ground conditions must be: 

Firm, drained, and graded

100

Boom deflection will _____ load radius.

increase

100

1926.1413 (c)(3) states joining lengths of wire rope by _____ is prohibited.

splicing

100

What type of wire rope must be removed from service when 3 or more broken wires are present in one strand of one lay?

Running or Right regular lay

100

What two measurements are used to determine the load radius?

Boom length and boom angle

200

Power lines, gas lines, sand and pot holes are examples of...

Possible site hazards

200

A boom angle indicator is required on all cranes with ______ booms. 

variable angle
200

According to OSHA, rope lubricant must not ______ inspection.

hinder

200

Pendant lines are classified as: 

Standing wire rope

200

The load should be applied when determining the:

Proper boom angle

300

Minimum distance for setup to an open excavation:

At least 1 times the trench depth to the fulcrum point

300

On the majority of cranes, power is transferred to the torque converter by a _____.

Master clutch

300
What can be used to prevent hazardous movement of a load?

Tag or restraint line

300

Type 1 rotation resistant wire rope has a design factor of...

5 to 1

300

What type of chart is used for cranes that are setup on a barge?

List Chart

400

What is the maximum elevation change in 25 feet and still be within 1% of grade? 

3 inches
400

The fluid level in the hydraulic reservoir ______ when the boom is extended.

decreases
400

Cranes manufactured after March 2003 with a rated capacity over 3 tons, must have at least one of these:

Load weighing device

Load moment indicator

Load moment limiter

400

The minimum design factor for right regular lay boom or hoist wire rope is...

3.5

400

What happens to the effective weight of the fly/jib when it goes from erected to stowed?

Decreases

500

Increasing the distance from the crane's center of gravity and the tipping axis will:

Increase stability 

500

Hoist drum flanges need to extend a minimum of ___ over the top layer of wire rope at all times while crane is in operation.

1/2 inch

500

1926.1431 requires what 5 devices when hoisting personnel? (hint: there's levels to this $h!t)

1. Boom angle indicator

2. Boom hoist limiting device

3. Boom length indicator

4. Anti-Two-Block

5. Controlled load lowering 

500

According to ASME B30.5, in rotation resistant rope, what is a sign of core failure?

Reduction of wire rope

500

Capacities shown above the bold line, or in the shaded area of a load chart are based on what?

Structural Competence